Gas Holder Station Motspur Park New Malden Data via plota.co.uk

26/02414/NMA - Non-Material Amendment Pending Consideration

Proposal

Application for a Non-Material Amendment to Planning Permission ref: 25/02562/FUL (Demolition of existing gasholders and associated above ground structures and buildings. Phased redevelopment of site to provide 8 to 16 storey 5nos blocks with 586 residential units and ancillary residential facilities (C3 Use Class), together with associated works to the existing accesses and internal vehicular routes, new pedestrian and cycle routes, the provision of new publicly accessible open space, amenity space, hard and soft landscaping, cycle and car parking, works to the brook embankment, re-siting of some gas infrastructure, ground works and plant and associated works. Cross boundary application with LB Merton: Development within Merton comprises works to existing vehicle access onto West Barnes Lane, including hard and soft landscaping and new public realm and associated ground works, to provide pedestrian and cycle route with access for emergency vehicles only, new pedestrian/cycle access routes to Marina Avenue and Sir Joseph Hood Memorial grounds. Application accompanied by an Environmental Statement.). Amendment to the finished ground floor levels and top of the lift overruns for Buildings D and E; installation of balustrades to the roofs of Buildings D and E; removal of doors to Building E ground floor East elevation and changes to landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Nov 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 11 Dec 2026.

Documents 20

Plans & drawings 14

PDF U096-MAC13-DX-00-DR-A-195-140402 Rev P3 Proposed Bay Study - Building D - Top Drawing · 13 Nov 2026 View ↗ PDF U096-FAB02-XX-XX-DR-L-810-010 Rev P02 Illustrative Colour Masterplan Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-XX-DR-A-191-132002 Rev P3 Proposed GA Section 2 Drawing · 13 Nov 2026 View ↗ PDF U096-FAB02-XX-XX-DR-L-810-003 Rev P02 Proposed Combined Hard and Soft Landscape GA - Sheet 3 Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-XX-DR-A-191-132001 Rev P3 Proposed GA Section 1 Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-EX-00-DR-A-195-140502 Rev P3 Proposed Bay Study - Building E - Top Drawing · 13 Nov 2026 View ↗ PDF U096-FAB02-XX-XX-DR-L-810-009 Rev P02 Site Sections Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-XX-DR-A-190-113002 Rev P3 Proposed Sitewide Elevation North and South Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-XX-DR-A-190-113001 Rev P3 Proposed Sitewide Elevation West and East Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-RF-DR-A-005-131017 Rev P3 Proposed GA Plan - Roof Plan Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-DX-XX-DR-A-190-133400 Rev P3 Proposed GA Elevations - Building D Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-SW-00-DR-A-005-131000 Rev P3 Proposed GA Plan - Level 00 Drawing · 13 Nov 2026 View ↗ PDF U096-MAC13-EX-XX-DR-A-190-133500 Rev P3 Proposed GA Elevations - Building E Drawing · 13 Nov 2026 View ↗ PDF U096-FAB02-XX-XX-DR-L-810-004 Rev P02 Proposed Combined Hard and Soft Landscape GA - Sheet 4 Drawing · 13 Nov 2026 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Local nature reserve 57 m away: Sir Joseph Hood Memorial Wood
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Kingston upon Thames built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment
Received
13 Nov 2026
Validated
13 Nov 2026
Ward
Motspur Park & Old Malden East
Parish
New And Old Malden
Case officer
Show
Target decision
11 Dec 2026
Applicant
Show

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15334475
Planning Portal ref
PP-15334475
Statutory expiry
11 Dec 2026
Env. assessment
No
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026