Land at Gorton Street and Adjacent Railway Arches, Gorton Street, Greengate, Salford, M3 7NL Data via plota.co.uk
Proposal
Application for a non‑material amendment to revise the finished floor level specified in Condition 27 (Flood Risk) of planning permission Data via plota.co.uk
Application progress
Approved on 10 Feb 2026 · Delegated Decision · Last checked 3 Oct 2026
Documents 4
Decision & officer reports 1
Statements & assessments 1
Plans & drawings 1
Other documents 1
Associated applications 3
Part of
Conditions 2, 27 varied
- AmendmentApplication for a non‑material amendment to revise the finished floor level specified…This applicationOTH/2025/1774
Site constraints 6
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Salford - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Former Aldridge Warehouse and Collier Street Baths, Queen Street and Collier Street, Salford, M3 7DW
Request for EIA Scoping Opinion for a residential development and associated ref...
Ground Floor 1 Balloon Street Manchester M4 4BE
Non material amendment to planning permission 145677/FO/2026 to amend the design...
Land Bounded by Great Ducie Street and Mirabel Street Manchester M3 1PJ
Discharge of condition 20 (b) (Acoustic Validation) attached to planning permiss...
The Stoller Hall 8 Hunts Bank Approach Manchester M3 1DA
Installation of non-illuminated individual letter and logo sign.
16-18 Royal Exchange Arcade Manchester M2 7EA
Listed Building Consent for the installation of internal signage and internal wo...
Church House 90 Deansgate Manchester M3 2GJ
Discharge of condition 4 (CMP) attached to planning permission 144036/FO/2025
Important details
How this decision compares
Decided in 56 days from validation, 10 days slower than Salford's median of 46 for amendments. Approved, as 95% of amendments here are.
Plota live figures for amendments decided by Salford in the last twelve months, from validation. Salford decision record →
Public comments
Last counted 3 Oct 2026
Consultation & key dates
- Comments by
- 4 Feb 2026
Historical activity at this location
17 nearby applications on record - archival context, not part of the live application.
Nearby activity
Salford is slower than most councils at deciding householder applications: #206 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Track this application
Land at Gorton Street and Adjacent Railway Arches, Gorton Street, Greengate, Salford, M3 7NL
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Land At Gorton Street And Adjacent Railway Arches, Gorton Street, Greengate, Salford
Demolition of existing lean-to building adjacent to railway arches 6-8 and erection of a 42-storey building, including basement and rooftop plant levels, comprising 568 co-living units with associated amenity, management and back of house space, plant rooms, accessible roof terraces, with ancillary facilities comprising amenity space, sporting facilities and waste storage in arches 1-3, and associated landscaping and engineering works [EIA application accompanied by an Environmental Statement]
- Received
- 24 Aug 2023
- Decided
- 20 Mar 2025
- Outcome
- Approved
