Golden Sands Holiday Park Quebec Road Mablethorpe Lincolnshire LN12 1QJ Data via plota.co.uk

02820/25/DPC - Discharge of Planning Conditions Decided

Proposal

Discharge of condition 3 (landscaping), condition 5 (site layout) and condition 7 (surface water drainage scheme) imposed on . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2025
✓
Responded
16 Sept 2025

Responded on 16 Sept 2025 · Delegated Decision · Last checked 14 Oct 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3, 5, 7 decided (outcome not recorded)

    • ConditionsDischarge of condition 3 (landscaping), condition 5 (site layout) and condition 7 (surface…This application02820/25/DPC

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 707 m away: Viking CCS Pipeline
The site is 707 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Theddlethorpe Flexible Generation Project (at pre-application, 1.1 km); Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 1.2 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Special protection area 362 m away: Greater Wash; Inside the Mablethorpe built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area354 m² (3,810 sq ft)
Energy ratingC (asset rating 58)
UseOffices and Workshop Businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Postcode
LN12 1QH
Received
22 Jul 2025
Validated
22 Jul 2025
Ward
Mablethorpe Ward
Parish
Mablethorpe & Sutton
Case officer
Show
Target decision
16 Sept 2025
Decision
Responded
Decision date
16 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
NBDA Ltd

Public comments

No public comments yet.

Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14123091
Planning Portal ref
PP-14123091
Statutory expiry
16 Sept 2025
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Householder decisions

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.