Ward Park, Hamilton Road, Bangor, BT20 4LG Data via plota.co.uk

LA06/2026/0567/DC - Discharge of Condition Consultation Open

Proposal

Discharge of condition 2 of previously approved application which states : All hard and soft landscape works shall be carried out in accordance with the approved plans Drawing Nos. 08A and 09A bearing the date stamp 15 December 2020 and Drawing No. 10 bearing the date stamp 14 October 2016, and the appropriate British Standard or other recognised Codes of Practice and shall be retained thereafter. A specification detailing the timing for the implementation of hard and soft landscaping works shall be submitted to and approved in writing by the Council prior to commencement of any works on the site. All l hard and soft landscaping shall be carried out in accordance with the approved specification. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape. Discharge of condition 7 of previously approved application which states : A Final Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Council in writing prior to the commencement of any works on site. This final CEMP shall contain all the mitigation as described in the Outline Construction Environmental Management Plan completed by Doran Consulting, dated November 2019 and shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during improvements construction phase. Discharge of condition 11 of previously approved application which states : A revised Noise Impact Assessment /Noise Management Plan for this development shall be submitted to and agreed by the Council in writing prior to any development works commencing on site. This report shall include: An assessment of the potential noise from construction activities which must have reference to BS 5228-1:2009+A1:2014 and include confirmation that the construction works will not exceed the Category A limit (65 dB LAeq daytime). An outline of the ongoing noise monitoring programme during all construction works, (including locations/ frequency) to verify compliance with the set levels. Details of all mitigation measures to control the construction noise from the site. The noise mitigation measures shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: In the interests of amenity. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2026
✓
Consultation
29 Jul 2026
Decision
Expected by 18 Aug 2026

Under consideration

No decision has been issued yet. A decision is expected by 18 Aug 2026.

The consultation period closed on 19 Aug 2026.

Associated applications 3

Site constraints 1

Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ards and North Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Condition
Postcode
BT20 4LG
Received
23 Jun 2026
Validated
23 Jun 2026
Ward
Broadway
Applicant
Show
Agent
John McQuillan Contracts

Consultation & key dates

Consultation
29 Jul 2026
Comments by
19 Aug 2026