LOCK 4 MACCLESFIELD CANAL Buxton Road, Bosley, Cheshire East Data via plota.co.uk

26/4014/LBC - Listed Building Consent Pending Consideration

Proposal

Listed Building Consent for repairs/replacement and safety upgrades to the lock including works to the bywash and adjoining washwall, top and bottom gates and access steps. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 27 Jan 2027 and 22 Mar 2027, from Cheshire East's recent listed building works.

Comments are open until 3 Dec 2026

Comment on this application ↗

Site constraints 5

Also on the record
2 listed buildings within 150 m of the postcode pin; Coalfield, development low risk area; Green belt about 4 m away: Merseyside and Greater Manchester; Inside the Macclesfield built-up area; Priority habitat about 14 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Gawsworth
Parish
Bosley
Case officer
Show
Target decision
30 Dec 2026
Decision level
Delegation
Applicant
Show

Decision outlook

Day 19 of the 56-day target. Cheshire East usually decides listed building works by day 108.

Day 1989 days to the predicted decision (day 108)
17%decided within 8 weeks
89%approved
144decided in the last year

Plota live figures for listed building works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Comments by
3 Dec 2026
Statutory expiry
30 Dec 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 overall
Relevant to this application:
Other decisions

Cheshire East is one of the slowest councils in England for householder decisions: #268 of 296 on speed. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026