Block 1 Bonchurch Road, W10 5NN. Block 2 Faraday Road, W10 5PQ, W10 5PL and W10 5PJ and Block 3 Faraday Road… Data via plota.co.uk

CL/26/03827 - Certificates Lawful Proposed Use or Dev. Consultation

Proposal

Proposed remediation measures for the external wall systems, including: works to install cavity barriers at compartment walls and floors; existing ACM panels and CW spandrel panels to be replaced by materials that achieve Euroclass A2-s1, d0 or better. All elements removed during works are to be replaced to match existing, with materials that satisfy current building regulations with regards to fire safety. No change to the building use or its scale and extent Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jul 2026
✓
Validated
22 Sept 2026
Decision
Target date was 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Nov 2026 and 15 Dec 2026, from Kensington and Chelsea's recent commercial and major works.

The consultation period closed on 16 Oct 2026.

Site constraints 6

Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 8 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Certificates Lawful Proposed Use or Dev.
Postcode
W10 5NN
Received
23 Jul 2026
Validated
22 Sept 2026
Ward
Golborne
Case officer
Show
Target decision
17 Nov 2026
Applicant
Show

Decision outlook

Day 62 of the 56-day target. Kensington and Chelsea usually decides commercial and major works by day 80.

Day 6218 days to the predicted decision (day 80)
35%decided within 8 weeks
84%approved
91decided in the last year

Plota live figures for commercial and major works decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Consultation & key dates

Comments by
16 Oct 2026
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 overall
Relevant to this application:
Householder decisions

Kensington and Chelsea is #174 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025