Flat Farm, Boarding Kennels, Whinfell, Kendal, Cumbria, LA8 9EJ Data via plota.co.uk

7/2026/5386 - Full Planning application Approved

Proposal

Erection of dog kennels to replace existing kennels in barn Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
✓
Validated
4 Aug 2026
✓
Consultation
21 Aug 2026
✓
Approved
22 Sept 2026

Approved on 22 Sept 2026 · Delegated · Last checked 23 Sept 2026

Site constraints 19

Water Supply and WasteHSE Major Accident Hazard PipelineArea of special control for advertsRisk of Flooding from Surface WaterGas pipeline zoneListed buildingMineral Safeguarding AreaLDNPExtenAppsGrade =Policy 01 Support - National and international significance of the Lake DistrictPolicy 02 Support - Spatial strategeyPolicy 03 Support - Development and floodingPolicy 05 Support - Protecting the spectacular landscapePolicy 06 Support - Design and developmentPolicy 20 Support - Renewal and low carb on energy
Lake District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Water Supply and WasteCouncil record
Recorded by the council for this site.
Council site ↗
HSE Major Accident Hazard PipelineCouncil record
Recorded by the council for this site.
Council site ↗
Area of special control for advertsCouncil record
Recorded by the council for this site.
Council site ↗
Risk of Flooding from Surface WaterCouncil record
Recorded by the council for this site.
Council site ↗
Gas pipeline zoneCouncil record
Recorded by the council for this site.
Council site ↗
Listed buildingCouncil record
Recorded by the council for this site.
Council site ↗
Mineral Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
LDNPExtenAppsCouncil record
Recorded by the council for this site.
Council site ↗
Grade =Council record
Recorded by the council for this site.
Council site ↗
Policy 01 Support - National and international significance of the Lake DistrictCouncil record
Recorded by the council for this site.
Council site ↗
Policy 02 Support - Spatial strategeyCouncil record
Recorded by the council for this site.
Council site ↗
Policy 03 Support - Development and floodingCouncil record
Recorded by the council for this site.
Council site ↗
Policy 05 Support - Protecting the spectacular landscapeCouncil record
Recorded by the council for this site.
Council site ↗
Policy 06 Support - Design and developmentCouncil record
Recorded by the council for this site.
Council site ↗
Policy 20 Support - Renewal and low carb on energyCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lake District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning application
Postcode
LA8 9EJ
Received
31 Jul 2026
Validated
4 Aug 2026
Ward
Sedbergh and Kirkby Lonsdale Ward
Parish
Whinfell
Case officer
Show
Target decision
24 Sept 2026
Decision
Approved with Conditions
Decision date
22 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Castle Design Services

How this decision compares

Decided in 49 days from validation, 6 days slower than Lake District's median of 43 for commercial and major works. Approved, as 89% of commercial and major works here are.

75%decided within 8 weeks
89%approved
6%go to committee

Plota live figures for commercial and major works decided by Lake District in the last twelve months, from validation. Lake District decision record →

Consultation & key dates

Alt. reference
PP-15048573
Site or press notice
21 Aug 2026
Statutory expiry
20 Oct 2026