THE BEECHES, 114 London Road, Holybourne, Alton, Hampshire, GU34 4EW Data via plota.co.uk

EHDC-25-1408-LBC - Listed Building Consent Approved

Proposal

Repairs to brick garden wall and stone front roadside wall including monitoring for ongoing movement. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Dec 2025
✓
Approved
28 Jan 2026

Approved on 28 Jan 2026 · Delegated · Last checked 19 Oct 2026

Site constraints 5

Grade II listed: The Beeches
List entry 1301716 · The pin is inside its outline · 14 more listed buildings within 150 m (14 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 14 with distances
Historic England ↗
Holybourne conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project 1.1 km away: Southampton to London Pipeline Project; Inside the Holybourne built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
GU34 4EW
Received
3 Dec 2025
Validated
3 Dec 2025
Ward
Alton Holybourne
Parish
Alton CP
Case officer
Show
Target decision
28 Jan 2026
Decision
CONSENT
Decision date
28 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
Perry + Bell Ltd

How this decision compares

Decided in 56 days from validation, 19 days faster than East Hampshire's median of 75 for extensions. Approved, as 92% of extensions here are.

32%decided within 8 weeks
92%approved
471decided in the last year

Plota live figures for extensions decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
5 Jan 2026
Statutory expiry
28 Jan 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Other decisions

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026