Middle Mill Halls Of Residence Portland Road Kingston Upon Thames KT1 2SJ Data via plota.co.uk

25/02541/FUL - Full Application Refused

Proposal

Demolition of existing student residential blocks at Middle Mill (Block A and Blocks G-L), and erection of a new 5-storey purpose-built teaching building (Use Class F1) for Kingston University with ground floor cafe and gallery space, associated access, blue-badge parking, landscaping and ancillary development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2025
✓
Validated
24 Oct 2025
✓
Consultation
18 Nov 2025
✗
Refused
22 Jul 2026
Appeal
Not lodged

Refused on 22 Jul 2026 · Committee Decision · Last checked 10 Oct 2026

Planning committee

Decided by Kingston upon Thames Planning Committee on 16 Jul 2026, in a recorded vote.

Refused by 7 votes to 1

No officer report was published for this decision; this summary is from the committee minutes.

  • Objectors, the applicant’s representatives and a councillor addressed the committee.
  • The committee refused permission by seven votes to one, with no abstentions.
Read how the committee decided The proposed teaching building, public speakers, key issues, refusal reasons and committee vote.

Source: Plota analysis of Kingston upon Thames's committee minutes of 16 Jul 2026.

Documents 52

Plans & drawings 48

PDF 05535 REV P02 Contextual Elevations Existing Revised Drawing · 6 Jul 2026 View ↗ PDF 05525 REV P02 Contextual Section Existing Revised Drawing · 6 Jul 2026 View ↗ PDF MM-A-GRA-PL-DR-XX-05206 REV P01 Proposed Section F-F Drawing · 3 Oct 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05502 Rev P01 Existing Site Plan - Demolition Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05520 Rev P01 Block A - Existing Sections Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05536 Rev P01 Existing Contextual Elevations Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L00-05101 Rev P01 Proposed Ground Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L01-05102 Rev P01 Proposed First Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L02-05103 Rev P01 Proposed Second Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L03-05104 Rev P01 Proposed Third Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L04-05105 Rev P01 Proposed Fourth Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L05-05106 Rev P01 Proposed Fifth Floor Plan - External Plant Enclosure Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-L06-05107 rev P01 Proposed Roof Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05001 Rev P01 Site Location Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05002 Rev P01 Proposed Site Block Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05003 Rev P01 Proposed Site Plan - Ground Floor Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05201 Rev P01 Proposed Section A-A Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05202 Rev P01 Proposed Section B-B Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05203 Rev P01 Proposed Section C-C Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05204 Rev P01 Proposed Section D-D Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05205 Rev P01 Proposed Section E-E Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05207 Rev P01 Proposed Contextual Sections Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05301 Rev P01 Proposed Southwest Elevation (Public Realm) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05302 Rev P01 Proposed Northwest Elevation (Hogsmill) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05303 Rev P01 Proposed Northeast Elevation (Weir) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05304 Rev P01 Proposed Southeast Elevation (Thames Water) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05305 Rev P01 Proposed Contextual Elevations Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05401 Rev P02 Proposed Northwest Facade Bay Elevation (Hogsmill) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-00351 Rev P01 Proposed Southwest Facade Bay Elevation (Public Realm) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-00354 Rev P01 Proposed Southeast Facade Bay Elevation (Thames Water) Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-00352 Rev P01 Proposed Facade Detail - Hogsmill Facade Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05501 Rev P01 Existing Site Block Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05511 Rev P01 Existing Ground Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05512 Rev P01 Existing First Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05513 Rev P01 Existing Second Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05514 Rev P01 Existing Third Floor Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05515 Rev P01 Existing Roof Plan Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05522 Rev P01 Existing Sections - Block G Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05521 Rev P01 Existing Sections - Block HJKL Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05530 Rev P01 Block A - Existing Elevations Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05531 Rev P01 Block HJKL - Existing Elevations Drawing · 29 Sept 2025 View ↗ PDF MM-A-GRA-PL-DR-XX-05532 Rev P01 Block G - Existing Elevations Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-PL-DR-ZZ-00001 Rev P15 Proposed Landscape Plan Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-R3-DR-ZZ-00002 Rev P07 Hard Landscape Materials Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-R3-DR-ZZ-00003 Rev P08 Soft Landscape Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-R3-DR-ZZ-00008 Rev P13 Landscape Plan - Proposed Levels Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-R3-DR-ZZ-00101 Rev P02 Landscape Section A Drawing · 29 Sept 2025 View ↗ PDF MM-LA-FLO-R3-DR-ZZ-00102 Rev P03 Landscape Section B and C Drawing · 29 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
3 listed buildings within 150 m; Conservation area 69 m away: Grove Crescent Conservation Area; Heritage at risk 69 m away: Grove Crescent, Kingston Town; Inside the Kingston upon Thames built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Flood defence 40 m away (natural high ground, designed for a 1 in 50 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
KT1 2SJ
Received
29 Sept 2025
Validated
24 Oct 2025
Ward
Kingston Town
Parish
Kingston And North Kingston
Target decision
23 Jan 2026
Decision
Refuse
Decision date
22 Jul 2026
Decision level
Committee Decision
Applicant
Show
Agent
Bidwells London

How this decision compares

Decided in 271 days from validation, 215 days slower than Kingston upon Thames's median of 56 for full applications. Refused, as 27% of full applications here are.

59%decided within 8 weeks
73%approved
310decided in the last year

Plota live figures for full applications decided by Kingston upon Thames in the last twelve months, from validation. Kingston upon Thames decision record →

Public comments

No public comments yet.

885 neighbours consulted · Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14127122
Planning Portal ref
PP-14127122
Neighbours
4 Nov 2025
Consultation
18 Nov 2025
Comments by
18 Dec 2025
Site or press notice
27 Nov 2025
Committee
16 Jul 2026
Statutory expiry
23 Jan 2026
Env. assessment
No
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use