All Electric Bus Depot, Former News Centre London Road Hilsea Portsmouth PO2 9DG Data via plota.co.uk

26/01091/NMA - Non-Material Amendment Approved

Proposal

A Application for non-material amendment to planning permission to seek approval of amendments to: Entrance path (amended from new access room), the ground floor window and door positions at the west elevation of the depot, cycle shelter and motorcycle shelter, high voltage infrastructure transformers, service lane accommodation (now a standalone cabin with further cabin type buildings for plant and compressors), battery size reduced, relocation of car parking spaces from the northwest of the service lane building to the north east, 3no cable bridges added to north of gantries and service lane building cladding amended to standard trapezoidal cladding (Amended Description) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Approved
17 Nov 2026

Approved on 17 Nov 2026 · Fully Delegated Decision · Last checked 17 Nov 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive
    • AmendmentA Application for non-material amendment to seek approval of amendments to: Entrance path…This application26/01091/NMA

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Scheduled monument 69 m away: Hilsea Lines
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 272 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 2; 1 listed building within 150 m; Conservation area 69 m away: Hilsea Lines; SSSI 421 m away: Portsmouth Harbour SSSI; Heritage at risk 69 m away: Hilsea Lines - Centre Bastion (excluding casemates referred to as Bastion 4), East Centre Curtain (Railway) west side (formerly known as Bastion no. 5), Hilsea; National infrastructure project 2 km away: AQUIND Interconnector; Inside the Portsmouth built-up area.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Non-Material Amendment
Postcode
PO2 9DG
Received
18 Sept 2026
Validated
18 Sept 2026
Ward
Hilsea
Case officer
Show
Target decision
16 Oct 2026
Decision
Approve
Decision date
17 Nov 2026
Decision level
Fully Delegated Decision
Applicant
Show
Agent
Vail WIlliams LLP

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15154436
Planning Portal ref
PP-15154436
Statutory expiry
16 Oct 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 overall
Relevant to this application:
Householder decisions

Portsmouth is #188 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026