25/01202/FUL - Full Planning Approved

Proposal

New mechanical scheme to roof, replacing the outdated, existing, roof mounted equipment Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Dec 2025
✓
Validated
6 Jan 2026
✓
Approved
3 Mar 2026

Approved on 3 Mar 2026 · Delegated Decision · Last checked 6 Jul 2026

Documents 21

All documents on the council site ↗

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Conservation area about 90 m away: St Laurence's, Chorley; Registered park or garden about 240 m away: Astley Hall; Inside the Chorley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chorley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chorley
Application type
Full Planning
Postcode
PR7 1DB
Received
10 Dec 2025
Validated
6 Jan 2026
Ward
Chorley North West
Parish
Chorley
Case officer
Show
Target decision
3 Mar 2026
Decision
Permit Full Planning Permission
Decision date
3 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Harrison Ince Architects Ltd

How this decision compares

Decided in 56 days from validation, 28 days slower than Chorley's median of 28 for utility and infrastructure works. Approved, as 100% of utility and infrastructure works here are.

87%decided within 8 weeks
100%approved
33decided in the last year

Plota live figures for utility and infrastructure works decided by Chorley in the last twelve months, from validation. Chorley decision record →

Consultation & key dates

Alt. reference
PP-14477618
Planning Portal ref
PP-14477618
Comments by
3 Feb 2026
Statutory expiry
3 Mar 2026
Env. assessment
No
Chorley
Planning Authority Score
7.5/10
Good
#42 of 296 councils
Relevant to this application:
Householder decisions

Chorley is faster than most councils at deciding householder applications, ranking #49 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chorley decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #51 of 296
95%
Householder approved
Above avg (90%) #73 of 296
78%
Decided in 8 weeks
Above avg (63%) #49 of 296
35%
Extended time limit
Below avg (41%) #100 of 296
95%
Minor dwellings approved
77 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
73%
Change of use approved
11 decided
553
Total decisions
39 refused in the year to March 2026