Beckside Livery Thorpe Road Carlton Stockton-On-Tees TS21 1DT Data via plota.co.uk

25/2155/CPE - Certificate Existing Lawful Use/Dev Awaiting decision

Proposal

Certificate of lawfulness application for the existing use as a single dwellinghouse (C3) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2025
✓
Validated
14 Oct 2025
✓
Consultation
27 Jan 2026
Decision
Target date was 25 May 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 10 Feb 2026; it is now day 407.

The consultation period closed on 10 Feb 2026.

Site constraints 7

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 143 m away: Byers Gill Solar
The site is about 143 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Coast Hydrogen Teesside Pipeline (at pre-application, about 1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Carlton (Stockton-on-Tees) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stockton-on-Tees - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Certificate Existing Lawful Use/Dev
Postcode
TS21 1DT
Received
13 Oct 2025
Validated
14 Oct 2025
Ward
Northern Parishes
Parish
Carlton Parish Council
Case officer
Show
Target decision
25 May 2026
Decision level
Delegated
Applicant
Show
Agent
ELG Planning

Decision outlook

Day 407, past the statutory target. 84% of lawful development certificates in Stockton-on-Tees are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 23 Nov 2026.

Day 407351 days past the 56-day target
56%decided within 8 weeks
94%approved
37decided in the last year

Plota live figures for lawful development certificates decided by Stockton-on-Tees in the last twelve months, from validation. Stockton-on-Tees decision record →

Public comments

No public comments yet.

Last counted 23 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14379363
Planning Portal ref
PP-14379363
Consultation
27 Jan 2026
Comments by
10 Feb 2026
Statutory expiry
9 Dec 2025
Env. assessment
No
Stockton-on-Tees
Planning Authority Score
5.8/10
Average
#112 of 296 overall
Relevant to this application:
Householder decisions

Stockton-on-Tees is #180 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Stockton-on-Tees decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #67 of 296
97%
Householder approved
Above avg (90%) #44 of 296
61%
Decided in 8 weeks
Below avg (63%) #180 of 296
40%
Extended time limit
Below avg (41%) #155 of 296
79%
Minor dwellings approved
19 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
86%
Change of use approved
44 decided
612
Total decisions
41 refused in the year to March 2026