Effluent Building Nestle Purina Petcare UK Limited Cromwell Road Wisbech Cambridgeshire Data via plota.co.uk

F/YR26/0392/F - Full Planning Permission Approved

Proposal

Erect an extension to existing building (to form a new water treatment facility) involving the demolition of existing treatment building, extend and enclose the existing canopy building and erect a 3.0m high acoustic fence Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Apr 2026
✓
Validated
28 May 2026
✓
Consultation
16 Jul 2026
✓
Approved
31 Jul 2026

Approved on 31 Jul 2026 · Delegated Decision · Last checked 1 Aug 2026

Documents 62

Statements & assessments 23

PDF FDC ECOLOGY OFFICER Consultee Comment · 5 Jun 2026 View ↗ PDF EMAIL TRAIL - DRAINAGE BOARD Other · 28 May 2026 View ↗ PDF PHASE 2 (GROUND INVESTIGATION) ASSESSMENT REPORT Report · 28 May 2026 View ↗ PDF AIR QUALITY (ODOUR) ASSESSMENT Report · 28 May 2026 View ↗ PDF EMISSIONS MONITORING AND ODOUR IMPACT ASSESSMENT Report · 28 May 2026 View ↗ PDF BNG Metric BNG Metric · 28 May 2026 View ↗ PDF 2127-003 TREE SURVEY Drawing · 28 May 2026 View ↗ PDF Biodiversity Checklist Biodiversity Checklist · 28 May 2026 View ↗ PDF BNG SUPPORTING STATEMENT Statement · 28 May 2026 View ↗ PDF SHEET 1 OF 2 TOPOGRAPHICAL SURVEY Drawing · 28 May 2026 View ↗ PDF SHEET 2 OF 2 TOPOGRAPHICAL SURVEY Drawing · 28 May 2026 View ↗ PDF APPENDIX F SURFACE WATER DRAINAGE PRO-FORMER Report · 28 May 2026 View ↗ PDF DRAINAGE SYSTEM MAINTENANCE AND MANAGEMENT PLAN Report · 28 May 2026 View ↗ PDF 250770-PEV-XX-XX-DR-C-0512 REV P05 EXCEEDANCE FLOOD ROUTE PLAN Drawing · 28 May 2026 View ↗ PDF 250770-PEV-XX-XX-DR-C-0590 REV P04 PROPOSED COMBINED SURFACE AND FOUL WATER DRAINAGE STRATEGY PLAN Drawing · 28 May 2026 View ↗ PDF TRANSPORT TECHNICAL NOTE Report · 28 May 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Report · 28 May 2026 View ↗ PDF BIODIVERSITY NET GAIN REPORT Report · 28 May 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL Report · 28 May 2026 View ↗ PDF DRAINAGE STRATEGY REPORT Report · 28 May 2026 View ↗ PDF Heritage Statement Heritage Statement · 28 May 2026 View ↗ PDF Design & Access Statement Design & Access Statement · 28 May 2026 View ↗ PDF Flood Risk Assessment Flood Risk Assessment · 28 May 2026 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Small Houses in Multiple Occupation (HMOs) in Wisbech. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Wisbech AQMA No.1 (SO2)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 157 m away: Medworth Energy from Waste Combined Heat and Power Facility
The site is 157 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Wisbech built-up area; Conservation area 97 m away: Wisbech; Heritage at risk 97 m away: Wisbech.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fenland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fenland
Application type
Full Planning Permission
Postcode
PE13 2RG
Received
8 Apr 2026
Validated
28 May 2026
Ward
Wisbech South
Parish
Wisbech Town Council
Case officer
Show
Target decision
23 Jul 2026
Decision
Grant
Decision date
31 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Jackson Design Associates

How this decision compares

Decided in 64 days from validation, 8 days slower than Fenland's median of 56 for commercial and major works. Approved, as 95% of commercial and major works here are.

63%decided within 8 weeks
95%approved
6%go to committee

Plota live figures for commercial and major works decided by Fenland in the last twelve months, from validation. Fenland decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 1 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14804913
Planning Portal ref
PP-14804913
Neighbours
2 Jun 2026
Consultation
16 Jul 2026
Comments by
30 Jul 2026
Site or press notice
9 Jun 2026
Statutory expiry
23 Jul 2026
Env. assessment
No
Fenland
Planning Authority Score
6.1/10
Average
#98 of 296 councils
Relevant to this application:
Householder decisions

Fenland is faster than most councils at deciding householder applications, ranking #58 out of 296. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Fenland decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #170 of 296
93%
Householder approved
Above avg (90%) #128 of 296
77%
Decided in 8 weeks
Above avg (63%) #58 of 296
42%
Extended time limit
Above avg (41%) #163 of 296
78%
Minor dwellings approved
194 decided (1-9 homes)
77%
Major dwellings approved
26 decided (10+ homes)
90%
Change of use approved
29 decided
604
Total decisions
79 refused in the year to March 2026