Marsh House North Common Road Thorne Doncaster DN8 4JS Data via plota.co.uk

26/01075/FUL - Full Application Awaiting decision

Proposal

Change of use of first floor of existing barn to form single bedroom first floor dwelling including external alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Jun 2026
✓
Validated
11 Aug 2026
✓
Consultation
6 Oct 2026
Decision
Expected by 6 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 27 Oct 2026; it is now day 59.

Comments are open until 27 Oct 2026

Comment on this application ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 482 m away: Yorkshire and Humber CCS Cross Country Pipeline
The site is 482 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Tween Bridge Solar Farm (under examination, 1996 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Humberhead Levels; Coalfield, development low risk area; Priority habitat 11 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Full Application
Postcode
DN8 4JS
Received
3 Jun 2026
Validated
11 Aug 2026
Ward
Thorne And Moorends
Parish
Thorne Town Council
Target decision
6 Oct 2026
Applicant
Show
Agent
Anthony Snowden Architect

Decision outlook

Day 59, past the statutory target. 89% of changes of use in Doncaster are decided within thirteen weeks, which runs to 10 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 5919 days to the predicted decision (day 78)
73%decided within 8 weeks
81%approved
124decided in the last year

Plota live figures for changes of use decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14982263
Planning Portal ref
PP-14982263
Consultation
6 Oct 2026
Comments by
27 Oct 2026
Site or press notice
24 Aug 2026
Statutory expiry
6 Oct 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 councils
Relevant to this application:
Change of use

Doncaster is one of the fastest councils in England for householder decisions, ranking #27 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026