McGovern House, Condor Road, Ilkeston, Derbyshire, DE7 4RE Data via plota.co.uk

ERE/038660 - Full planning permission Refused

Proposal

Change of use of land and extension of existing site boundary to create larger yard Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Validated
30 Jan 2026
✗
Refused
11 Jun 2026
Appeal
Not lodged

Refused on 11 Jun 2026 · Local Area Committee · Last checked 24 Sept 2026

Planning committee

Decided by Erewash Planning Committee on 10 Jun 2026.

Refused

As officers recommended.

  • Officers advised refusal because the proposal would remove flood storage without compensation and increase flood risk concerns.
  • The Environment Agency objected, while no representations were received from adjoining occupiers.
  • The committee refused the application in line with the officer recommendation.

Source: Plota analysis of Erewash's committee minutes, Erewash Planning Committee minutes, 10 June 2026 .

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Ilkeston built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Erewash - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Erewash
Application type
Full planning permission
Postcode
DE7 4RE
Received
2 Dec 2025
Validated
30 Jan 2026
Ward
Hallam Fields
Target decision
11 Jun 2026
Decision
Refuse
Decision date
11 Jun 2026
Decision level
Local Area Committee
Applicant
Show

How this decision compares

Decided in 132 days from validation, 77 days slower than Erewash's median of 55 for changes of use. Refused, as 26% of changes of use here are.

54%decided within 8 weeks
74%approved
14%go to committee

Plota live figures for changes of use decided by Erewash in the last twelve months, from validation. Erewash decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Erewash
Planning Authority Score
7.4/10
Good
#48 of 296 councils
Relevant to this application:
Change of use

Erewash ranks #161 out of 296 councils for householder decision speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Erewash decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #54 of 296
97%
Householder approved
Above avg (90%) #31 of 296
62%
Decided in 8 weeks
Below avg (63%) #161 of 296
28%
Extended time limit
Below avg (41%) #44 of 296
83%
Minor dwellings approved
53 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
76%
Change of use approved
17 decided
390
Total decisions
27 refused in the year to March 2026