Land at A320 Guildford Road Junction 6 Chertsey Data via plota.co.uk

RU.25/0935 - County Matter Decided

Proposal

Details of Construction and Environmental Management Plan (CEMP) submitted pursuant to Condition 9 of planning permission ref: dated 11 July 2023 (this application is determined by Surrey County Council under their ref ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 4 Jul 2025
✓
Decided
12 Mar 2026

Decided on 12 Mar 2026 · Last checked 15 Oct 2026

Associated applications 9

Site constraints 5

National infrastructure project about 43 m away: Southampton to London Pipeline Project
The site is about 43 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Chertsey built-up area; Air quality management area about 77 m away: M25 Aqma; Green belt about 88 m away: London; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Runnymede - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Runnymede
Application type
County Matter
Received
around 4 Jul 2025
Validated
4 Jul 2025
Ward
Ottershaw
Case officer
Show
Decision date
12 Mar 2026
Runnymede
Planning Authority Score
5.2/10
Average
#140 of 296 overall
Relevant to this application:
Householder decisions

Runnymede is #108 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Runnymede decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #242 of 296
89%
Householder approved
Below avg (90%) #208 of 296
72%
Decided in 8 weeks
Above avg (63%) #108 of 296
36%
Extended time limit
Below avg (41%) #113 of 296
66%
Minor dwellings approved
74 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
55%
Change of use approved
11 decided
661
Total decisions
110 refused in the year to March 2026