Land extending northwest from Rosebury Farm to Public Footpath EAT/14, Rosebury Farm, Harling Road, Eaton…Land extending northwest from Rosebury Farm to Public Footpath EAT/14, Rosebury Farm, Harling Road, Eaton Bray, Dunstable, LU6 1QZ Data via plota.co.uk
Proposal
Construction of a pedestrian footpath connecting Rosebury Farm to Public Footpath EAT/14, associated fencing and connection works Data via plota.co.uk
Application progress
Approved on 9 Nov 2026 · Last checked 10 Nov 2026
Site constraints 6
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
18 Moor End, Eaton Bray, Dunstable, LU6 2HN
Two storey rear extension with rooflights and window to first floor side elevati...
Land To The North Of Ford Lane Edlesborough LU6 2JB
Outline application with all matters reserved for the demolition and clearance o...
Rosebury Farm, Bellows Mill Lane, Eaton Bray
Prior Notification of Householder Extension: Single storey rear and side/rear ex...
Rosebury Farm, Bellows Mill Lane, Eaton Bray, LU6 2QY
Single storey side/rear and rear extensions and detached garage
Important details
- Council
- Central Bedfordshire
- Application type
- Full Application
- Postcode
- LU6 1QZ
- Received
- 14 Aug 2026
- Validated
- 18 Sept 2026
- Parish
- Eaton Bray
- Case officer
- Show
- Target decision
- 13 Nov 2026
- Decision
- Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )Any works affecting the public right of way should be carried out in consultation with the Local Highway Authority's Public Rights of Way Team. The route must remain open and available for public use at all times unless prior authorisation for a temporary closure has been obtained. Any replacement structures or alterations should comply with current accessibility standards and should not introduce new obstructions to users of the public right of way.Any works affecting the public right of way should be carried out in consultation with the Local Highway Authority's Public Rights of Way Team. The route must remain open and available for public use at all times unless prior authorisation for a temporary closure has been obtained. Any replacement structures or alterations should comply with current accessibility standards and should not introduce new obstructions to users of the public right of way.
- Decision date
- 9 Nov 2026
- Agent
- James Lovell
How this decision compares
Decided in 52 days from validation, 13 days faster than Central Bedfordshire's median of 65 for utility and infrastructure works. Approved, as 91% of utility and infrastructure works here are.
Plota live figures for utility and infrastructure works decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →
Public comments
No public comments yet.
Last counted 10 Nov 2026
Consultation & key dates
- Consultation
- 18 Sept 2026
- Comments by
- 29 Oct 2026
- Site or press notice
- 7 Oct 2026
Historical activity at this location
5 nearby applications on record - archival context, not part of the live application.
Nearby activity
Central Bedfordshire is faster than most councils at deciding householder applications: #62 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Track this application
Land extending northwest from Rosebury Farm to Public Footpath EAT/14, Rosebury Farm, Harling Road, Eaton Bray, Dunstable, LU6 1QZ
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
