SS8 Land at Hordle Lane, Hordle SO41 0HT Data via plota.co.uk

26/10911 - Reserved Matters Registered

Proposal

Approval of reserved matters (appearance, layout, scale and landscaping) for the erection of 141 dwellings, associated public open space, landscaping and associated infrastructure pursuant to outline planning permission secured via the hybrid consent reference . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Sept 2026
✓
Validated
2 Oct 2026
✓
Consultation
5 Oct 2026
Decision
Expected by 1 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 27 Nov 2026 and 9 Dec 2026, from New Forest (District)'s recent new homes.

Comments are open until 30 Oct 2026

Comment on this application ↗

Documents 32

All documents on the council site ↗

Associated applications 2

  • Part of

    Fullcouncil archive
    • Reserved mattersApproval of reserved matters (appearance, layout, scale and landscaping) for the erection…This application26/10911

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Green belt 32 m away: South West Hampshire.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Reserved Matters
Postcode
SO41 0HT
Received
24 Sept 2026
Validated
2 Oct 2026
Ward
Milford & Hordle
Parish
Hordle
Case officer
Show
Target decision
1 Jan 2027
Applicant
Show
Agent
Turley

Decision outlook

Day 7 of the 91-day target. New Forest (District) usually decides new homes by day 64.

Day 784 days to the 91-day target
43%decided within 8 weeks
50%approved
47decided in the last year

Plota live figures for new homes decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

4comments received
3 objecting1 neutral

75% object · above the UK average of 74%

231 neighbours consulted · Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15074325
Planning Portal ref
PP-15074325
Consultation
5 Oct 2026
Comments by
30 Oct 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Major dwellings

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026