The Grange Park Road Johnstone PA5 8LS Data via plota.co.uk

26/0630/LB - Listed Building Consent Awaiting decision

Proposal

Replace existing original windows with new double glazed UPVC windows with two opening side windows and one central static panel Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
22 Sept 2026
Decision
Target date was 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 19 Nov 2026; it is now day 58.

Site constraints 3

Grade C listed: The Grange And Gatepiers, Park Road, Paisley
List entry LB48614 · 1 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic Environment Scotland ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Renfrewshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
PA5 8LS
Received
13 Aug 2026
Validated
22 Sept 2026
Ward
8 - Johnstone South And Elderslie
Parish
Johnstone Community Council
Case officer
Show
Decision level
Delegated
Applicant
Show

Decision outlook

Day 58, past the statutory target. 96% of extensions in Renfrewshire are decided within thirteen weeks, which runs to 22 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 13 Nov 2026.

Day 582 days past the 56-day target
78%decided within 8 weeks
100%approved
230decided in the last year

Plota live figures for extensions decided by Renfrewshire in the last twelve months, from validation. Renfrewshire decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100765074-001
Env. assessment
No