New House Farm, CANASTON BRIDGE, Narberth, Pembrokeshire, SA67 8DE Data via plota.co.uk

Proposal

Farm diversification with provision of further new storage sheds for bio-mass fu Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
28 Aug 2026
✓
Consultation
17 Sept 2026
✓
Approved
22 Oct 2026

Approved on 22 Oct 2026 · Decision to be made by officer · Last checked 22 Oct 2026

Site constraints 10

Catchment Greenhill SchoolBat Priority SpeciesCatchment St Oswalds VAScheduled Ancient Monuments Buffer 500Policy SP.9 Welsh Language
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National park 31 m away: Pembrokeshire Coast
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Scheduled monument 129 m away: Castell Coch
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Catchment Greenhill SchoolCouncil record
Recorded by the council for this site.
Council site ↗
Bat Priority SpeciesCouncil record
Recorded by the council for this site.
Council site ↗
Catchment St Oswalds VACouncil record
Recorded by the council for this site.
Council site ↗
Scheduled Ancient Monuments Buffer 500Council record
Recorded by the council for this site.
Council site ↗
Policy SP.9 Welsh LanguageCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1902 m away: Gwynt Glas Offshore Wind Farm, at pre-application.
Not affected
Outside flood zones 2 and 3 · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Pembrokeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
SA67 8DE
Received
17 Aug 2026
Validated
28 Aug 2026
Ward
Martletwy
Case officer
Show
Target decision
22 Oct 2026
Decision date
22 Oct 2026
Decision level
Decision to be made by officer
Applicant
Show
Agent
Hayston Developments & Planning Ltd

How this decision compares

Decided in 55 days from validation, about the council's usual 53 days. Approved, as 81% of agricultural works here are.

83%decided within 8 weeks
81%approved
77decided in the last year

Plota live figures for agricultural works decided by Pembrokeshire in the last twelve months, from validation. Pembrokeshire decision record →

Consultation & key dates

Alt. reference
PP-15119060
Site or press notice
17 Sept 2026
Statutory expiry
5 Oct 2026