Havant Thicket Reservoir Site Data via plota.co.uk

APP/25/00988 - Approval of reserved matters Approved

Proposal

Application for approval of all Reserved Matters (siting, scale, external appearance and landscaping) relating to Phase 5 (Control House) of the Thicket Reservoir development pursuant to condition 2 of the S73 consent planning reference dated 6th December 2024. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Dec 2025
✓
Approved
14 Apr 2026

Approved on 14 Apr 2026 · Full Council · Last checked 26 Sept 2026

Planning committee

Decided by Havant Planning Committee on 12 Mar 2026.

Approved

As officers recommended.

No officer report was published for this decision; this summary is from the committee minutes.

  • Officers recommended approving the reserved matters for the control house, covering its siting, scale, external appearance and landscaping.
  • The applicant's agents and officers answered members' questions on site security, the bat roost features and compliance with the earlier permission.
  • Members raised concerns that a workshop was no longer included; officers proposed a condition to secure its details in a later phase, and the committee resolved to grant permission subject to conditions.
Read how the committee decided The site, the officers' recommendation, who spoke, the debate and the conditions attached to approval.

Source: Plota analysis of Havant's committee minutes of 12 Mar 2026.

Documents 39

All documents on the council site ↗

Associated applications 14

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project: Hampshire Water Transfer and Water Recycling Project
The site is inside the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Approval of reserved matters
Postcode
PO7 8RD
Received
1 Dec 2025
Validated
1 Dec 2025
Ward
Leigh Park Hermitage
Target decision
2 Mar 2026
Decision
Approve with Conditions
Decision date
14 Apr 2026
Decision level
Full Council
Applicant
Show
Agent
Andy Turner

How this decision compares

Decided in 134 days from validation, 28 days slower than Havant's median of 106 for reserved matters. Approved, as 97% of reserved matters here are.

22%decided within 8 weeks
97%approved
11%go to committee

Plota live figures for reserved matters decided across the UK in the last twelve months, from validation; too few recent reserved matters in Havant to go on. Havant decision record →

Public comments

6comments received
2 objecting4 neutral

33% object · below the UK average of 74%

Last counted 26 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
12 Mar 2026
Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Major dwellings

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026