Land North Of Highwood Road Roundabout Writtle Chelmsford Essex Data via plota.co.uk

25/01025/FUL Approved

Proposal

Change of use of land to 1 no. Gypsy/Traveller pitch comprising 1 no. mobile home and 1 no. touring caravan with associated works. Formation of new access. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jul 2025
✓
Approved
25 Feb 2026

Approved on 25 Feb 2026 · Last checked 15 Oct 2026

Planning committee

Decided by Chelmsford Planning Committee on 24 Feb 2026.

Approved

As officers recommended.

  • Officers advised approval because the site was grey belt land, pitch need remained unmet and adverse impacts did not outweigh the benefits.
  • Supporters cited the grey belt policy and changes since earlier refusals; objectors raised harm, excessive hardstanding and unsafe walking access.
  • The committee approved the application subject to the report and green-sheet conditions.
Read how the committee decided The proposal, site history, officers’ assessment, objections, speakers, debate, vote and approval conditions. Includes the meeting recording, from 0:06:39 where this application was taken

Source: Plota analysis of Chelmsford's committee minutes of 24 Feb 2026.

Associated applications 2

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 13 m away: Norwich to Tilbury
The site is about 13 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chelmsford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chelmsford
Received
18 Jul 2025
Validated
18 Jul 2025
Target decision
27 Feb 2026
Decision date
25 Feb 2026

How this decision compares

Decided in 222 days from validation, 167 days slower than Chelmsford's median of 55 for full applications. Approved, as 89% of full applications here are.

69%decided within 8 weeks
89%approved
467decided in the last year

Plota live figures for full applications decided by Chelmsford in the last twelve months, from validation. Chelmsford decision record →

Public comments

12comments received
12 objecting

100% object · above the UK average of 74%

13 neighbours consulted · Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14160383
Planning Portal ref
PP-14160383
Comments by
22 Aug 2025
Committee
24 Feb 2026
Chelmsford
Planning Authority Score
7.4/10
Good
#45 of 296 overall
Relevant to this application:
Change of use

Chelmsford is one of the fastest councils in England for householder decisions: #23 of 296 on speed. Only 21% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chelmsford decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #167 of 296
90%
Householder approved
Above avg (90%) #188 of 296
84%
Decided in 8 weeks
Above avg (63%) #23 of 296
21%
Extended time limit
Below avg (41%) #19 of 296
76%
Minor dwellings approved
164 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
79%
Change of use approved
52 decided
1,304
Total decisions
168 refused in the year to March 2026