Howe Green, Hartsop, Penrith, CA11 0NZ Data via plota.co.uk

7/2026/3104 - Listed Building Consent application Valid.

Proposal

Internal alterations to the byre to provide a site office Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
✓
Validated
16 Sept 2026
✓
Consultation
2 Oct 2026
Decision
Target date was 28 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 68.

The consultation period closed on 9 Oct 2026.

Site constraints 20

Water Supply and WasteArea of special control for advertsPrevious planning applicationsSites and monuments record (SMR)Mineral Safeguarding AreaNutrient Neutrality CatchmentHartsopGrade IIPolicy 01 Support - National and international significance of the Lake DistrictPolicy 06 Support - Design and development
Grade II listed: How Green Farmhouse; Farm Buildings Attached to How Green Farmhouse
List entry 1245323 · The pin is inside its outline · 10 more listed buildings within 150 m (10 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 10 with distances
Historic England ↗
Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Lake District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
World heritage site: The English Lake District
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Hartsop conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Water Supply and WasteCouncil record
Recorded by the council for this site.
Council site ↗
Area of special control for advertsCouncil record
Recorded by the council for this site.
Council site ↗
Previous planning applicationsCouncil record
Recorded by the council for this site.
Council site ↗
Sites and monuments record (SMR)Council record
Recorded by the council for this site.
Council site ↗
Mineral Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Nutrient Neutrality CatchmentCouncil record
Recorded by the council for this site.
Council site ↗
HartsopCouncil record
Recorded by the council for this site.
Council site ↗
Grade IICouncil record
Recorded by the council for this site.
Council site ↗
Policy 01 Support - National and international significance of the Lake DistrictCouncil record
Recorded by the council for this site.
Council site ↗
Policy 06 Support - Design and developmentCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 4; SSSI 396 m away: Brothers Water SSSI; Priority habitat 16 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lake District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent application
Postcode
CA11 0NZ
Received
3 Sept 2026
Validated
16 Sept 2026
Ward
Greystoke and Ullswater Ward
Parish
Patterdale
Case officer
Show
Target decision
28 Oct 2026
Decision level
Delegated

Decision outlook

Day 68, past the statutory target. 88% of commercial and major works in Lake District are decided within thirteen weeks, which runs to 16 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 6812 days past the 56-day target
73%decided within 8 weeks
88%approved
7%go to committee

Plota live figures for commercial and major works decided by Lake District in the last twelve months, from validation. Lake District decision record →

Consultation & key dates

Alt. reference
PP-15199138
Comments by
9 Oct 2026
Site or press notice
26 Sept 2026
Statutory expiry
14 Oct 2026