Land Off St Michaels Close Halam Data via plota.co.uk

Decided 25/01319/PIP
Appeal
Allowed · 14 Jan 2026 · Written Representations · Inspectorate case 6001425 ↗
Date received
4 Aug 2025
Date validated
5 Aug 2025

Description

Application for permission in principle for residential development of four to nine dwellings Data via plota.co.uk

Last checked

Planning committee

Decided by Newark and Sherwood Planning Committee on 2 Oct 2025. The council has not yet issued its decision notice.

Refused by 8 votes to 2

Against officer advice: officers had recommended approval.

  • Officers advised approval because the site, use and housing amount were acceptable in principle under the tilted balance.
  • The parish council and 32 residents objected, mainly citing highways, flooding, village character and backland development.
  • The committee voted 8–2 to refuse, citing Policy DM8, the open countryside location, backland development and the disproportionate number of houses.
Read how the committee decided The proposal, site and history, officers’ assessment, objections, speakers, committee debate, vote and refusal reasons.

Source: Plota analysis of Newark and Sherwood's committee minutes of 2 Oct 2025.

Site constraints 4

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; 1 listed building within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newark and Sherwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Newark and Sherwood
Planning Authority Score
3.9/10
Below average
#198 of 296 councils
Relevant to this application:
Householder decisions

Newark and Sherwood is slower than most councils at deciding householder applications, ranking #241 out of 296. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newark and Sherwood decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #88 of 296
96%
Householder approved
Above avg (90%) #55 of 296
50%
Decided in 8 weeks
Below avg (63%) #241 of 296
54%
Extended time limit
Above avg (41%) #244 of 296
80%
Minor dwellings approved
110 decided (1-9 homes)
88%
Major dwellings approved
25 decided (10+ homes)
82%
Change of use approved
33 decided
767
Total decisions
63 refused in the year to March 2026