Roslyn Dumfries Kirkton DG1 1ST Data via plota.co.uk

26/1441/FUL - Full Application Assessment Stage

Proposal

Erection of domestic outbuilding - retrospective Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
✓
Validated
13 Nov 2026
Decision
Expected by 8 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 7 Jan 2027, from Dumfries's recent extensions.

Site constraints 3

5 listed buildings within 150 m of the postcode pin
Nearest: 5 Weighbridge Cottages, Kirkton, Grade B, about 30 m from the postcode pin · 1 Grade B, 4 Grade C
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic Environment Scotland ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Kirkton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Not affected
No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dumfries - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dumfries
Application type
Full Application
Postcode
DG1 1ST
Received
18 Aug 2026
Validated
13 Nov 2026
Ward
Lochar
Parish
Kirkmahoe Community Council
Applicant
Show
Agent
Stuart Beattie Design

Decision outlook

Day 5 of the 56-day target. Dumfries usually decides extensions by day 50.

Day 551 days to the 56-day target
70%decided within 8 weeks
95%approved
365decided in the last year

Plota live figures for extensions decided by Dumfries in the last twelve months, from validation. Dumfries decision record →

Public comments

No public comments yet.

Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100763569-001
Env. assessment
No