Mill House Building, 21A Three Colts Lane, London, E2 6JL Data via plota.co.uk

PA/26/01314/NC - Listed Building Consent (S8 P&LBC 1990) Registered

Proposal

Proposed replacement of windows with double-glazed timber windows (ground floor windows are not part of this application). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Consultation
14 Aug 2026
Decision
Expected by 23 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 72.

Site constraints 8

Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
1 listed building within 150 m of the postcode pin
Nearest: 21 and 23, Three Colts Lane E2, Grade II, about 9 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project about 1194 m away: Thames Tideway Tunnel; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Priority habitat about 45 m away: Deciduous woodland; Designated open space about 45 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (S8 P&LBC 1990)
Postcode
E2 6JL
Received
29 Jul 2026
Validated
29 Jul 2026
Ward
Bethnal Green West
Case officer
Show
Target decision
23 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Arun Associates LTD

Decision outlook

Day 72, past the statutory target. 90% of extensions in Tower Hamlets are decided within thirteen weeks, which runs to 28 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Oct 2026.

Day 7216 days past the 56-day target
67%decided within 8 weeks
88%approved
329decided in the last year

Plota live figures for extensions decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Site or press notice
14 Aug 2026
Statutory expiry
23 Sept 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026