G France Ltd Carr Lane Pilling Preston Lancashire PR3 6HH Data via plota.co.uk

25/00781/DIS - Discharge of conditions Approved

Proposal

Approval of details reserved by condition 9 (Biodiversity Gain Plan) on planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Mar 2026
✓
Consultation
10 Mar 2026
✓
Approved
5 Jun 2026

Approved on 5 Jun 2026 · Delegated Decision · Last checked 31 Aug 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 9 discharged

    • ConditionsApproval of details reserved by condition 9 (Biodiversity Gain Plan)This application25/00781/DIS

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Morecambe Bay Limestones and Wetlands; National infrastructure project about 1444 m away: Preesall Saltfield Underground Gas Storage; Inside the Pilling built-up area; Priority habitat about 49 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wyre - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wyre
Application type
Discharge of conditions
Postcode
PR3 6HH
Received
3 Mar 2026
Validated
3 Mar 2026
Ward
Pilling
Parish
Pilling
Case officer
Show
Target decision
28 Apr 2026
Decision
Accepted
Decision date
5 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lee Fenton Planning Services Ltd

Public comments

No public comments yet.

Last counted 31 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14751364
Planning Portal ref
PP-14751364
Consultation
10 Mar 2026
Comments by
31 Mar 2026
Statutory expiry
28 Apr 2026
Env. assessment
No
Wyre
Planning Authority Score
1.2/10
Poor
#288 of 296 councils
Relevant to this application:
Householder decisions

Wyre is one of the slowest councils in England for householder decisions, ranking #272 out of 296. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wyre decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #243 of 296
88%
Householder approved
Below avg (90%) #228 of 296
38%
Decided in 8 weeks
Below avg (63%) #272 of 296
66%
Extended time limit
Above avg (41%) #281 of 296
56%
Minor dwellings approved
41 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
52 decided
539
Total decisions
90 refused in the year to March 2026