Land Rear Of 5 - 15 The Coppice Burbage Leicestershire Data via plota.co.uk

25/01078/CONDIT - Variation of Condition Approved

Proposal

Application to vary condition 7 of planning permission . To allow for relocation of foul water pumping station Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Nov 2025
✓
Approved
2 Apr 2026

Approved on 2 Apr 2026 · Delegated Decision · Last checked 10 Oct 2026

Associated applications 2

  • Part of

    VariationApprovedcouncil archive

    Conditions 7 varied

    • VariationApplication to vary condition 7. To allow for relocation of foul water pumping stationThis application25/01078/CONDIT

Site constraints 4

National infrastructure project about 139 m away: Hinckley National Rail Freight Interchange
The site is about 139 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Hinckley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hinckley and Bosworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Variation of Condition
Received
7 Nov 2025
Validated
7 Nov 2025
Ward
Burbage St Catherines & Lash Hill
Parish
Burbage Parish Council
Case officer
Show
Target decision
2 Jan 2026
Decision
Planning Permission
Decision date
2 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Hayward Architects Ltd

How this decision compares

Decided in 146 days from validation, 74 days slower than Hinckley and Bosworth's median of 72 for amendments. Approved, as 99% of amendments here are.

42%decided within 8 weeks
99%approved
73decided in the last year

Plota live figures for amendments decided by Hinckley and Bosworth in the last twelve months, from validation. Hinckley and Bosworth decision record →

Consultation & key dates

Alt. reference
PP-14316909
Planning Portal ref
PP-14316909
Comments by
5 Dec 2025
Statutory expiry
2 Jan 2026
Env. assessment
No
Hinckley and Bosworth
Planning Authority Score
2.8/10
Poor
#238 of 296 overall
Relevant to this application:
Householder decisions

Hinckley and Bosworth is one of the slowest councils in England for householder decisions: #273 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hinckley and Bosworth decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #154 of 296
94%
Householder approved
Above avg (90%) #109 of 296
37%
Decided in 8 weeks
Below avg (63%) #273 of 296
56%
Extended time limit
Above avg (41%) #254 of 296
65%
Minor dwellings approved
46 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
86%
Change of use approved
21 decided
520
Total decisions
63 refused in the year to March 2026