Land North West Of Unit D Belgrave Retail Park Sandown Road Wisbech Cambridgeshire Data via plota.co.uk

F/YR26/0737/F - Full Planning Permission Pending consideration

Proposal

Installation of 6 x rapid electric vehicle charging stations and ancillary equipment, and 2 x fully accessible EV charging bays Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
✓
Validated
5 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Nov 2026, from Fenland's recent utility and infrastructure works.

Documents 30

All documents on the council site ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Small Houses in Multiple Occupation (HMOs) in Wisbech. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 249 m away: Medworth Energy from Waste Combined Heat and Power Facility
The site is 249 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Wisbech built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fenland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fenland
Application type
Full Planning Permission
Received
23 Sept 2026
Validated
5 Oct 2026
Ward
Wisbech South
Parish
Wisbech Town Council
Target decision
30 Nov 2026
Applicant
Show

Decision outlook

Day 4 of the 56-day target. Fenland usually decides utility and infrastructure works by day 54.

Day 452 days to the 56-day target
77%decided within 8 weeks
98%approved
45decided in the last year

Plota live figures for utility and infrastructure works decided by Fenland in the last twelve months, from validation. Fenland decision record →

Public comments

No public comments yet.

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15243692
Planning Portal ref
PP-15243692
Statutory expiry
30 Nov 2026
Env. assessment
No
Fenland
Planning Authority Score
6.1/10
Average
#98 of 296 councils
Relevant to this application:
Householder decisions

Fenland is faster than most councils at deciding householder applications, ranking #58 out of 296. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Fenland decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #170 of 296
93%
Householder approved
Above avg (90%) #128 of 296
77%
Decided in 8 weeks
Above avg (63%) #58 of 296
42%
Extended time limit
Above avg (41%) #163 of 296
78%
Minor dwellings approved
194 decided (1-9 homes)
77%
Major dwellings approved
26 decided (10+ homes)
90%
Change of use approved
29 decided
604
Total decisions
79 refused in the year to March 2026