Land At Grid Reference 244140 128473 Northam Devon Data via plota.co.uk

1/0050/2026/REMM - Full Application Major Awaiting Decision

Proposal

Reserved matters application for appearance, landscaping, layout & scale pursuant to planning approval in respect of phase 2 (Variation of conditions 1, 6, 7, 9 & 10 of planning approval ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
21 Jan 2026
Validated
29 Jan 2026
Consultation
17 Jul 2026
Decision
Expected by 30 Apr 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 30 Apr 2026. The consultation period closed on 7 Aug 2026.

Documents 69

Statements & assessments 23

PDF Planning Statement Planning Statement · 21 Jan 2026 View ↗ PDF PHASE 2 COMPARISON OF ADOPTED DRAINAGE Drawing · 21 Jan 2026 View ↗ PDF CONSTRUCTION PLAN AND TEMPORARY DRAINAGE MEASURES PARCEL 1 Drawing · 21 Jan 2026 View ↗ PDF CONSTRUCTION PLAN AND TEMPORARY DRAINAGE MEASURES PARCEL 2 Drawing · 21 Jan 2026 View ↗ PDF CONSTRUCTION PLAN AND TEMPORARY DRAINAGE MEASURES PARCEL 4 Drawing · 21 Jan 2026 View ↗ PDF PROPOSED HIGHWAYS DRAINAGE LONG SECTIONS Drawing · 21 Jan 2026 View ↗ PDF POST DEVELOPMENT FLOOD EXCEEDANCE ROUTES Drawing · 21 Jan 2026 View ↗ PDF PROPOSED S38 HIGHWAYS DRAINAGE LAYOUT Drawing · 21 Jan 2026 View ↗ PDF PHASE 2A S104 DRAINAGE LAYOUT SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2A S104 DRAINAGE LAYOUT SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2D S104 DRAINAGE LAYOUT Drawing · 21 Jan 2026 View ↗ PDF PHASE 2E S104 DRAINAGE LAYOUT Drawing · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF Drainage Report Drainage Report · 21 Jan 2026 View ↗ PDF CONSTRUCTION PLAN AND TEMPORARY DRAINAGE MEASURES PARCEL 3 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2B S104 DRAINAGE LAYOUT SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2B S104 DRAINAGE LAYOUT SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2C S104 DRAINAGE LAYOUT Drawing · 21 Jan 2026 View ↗

Plans & drawings 25

PDF DCC ARCHAEOLOGY SECTION Consultee Comment · 9 Feb 2026 View ↗ PDF LOCATION PLAN Drawing · 21 Jan 2026 View ↗ PDF BUND DETAIL Drawing · 21 Jan 2026 View ↗ PDF PROPOSED IMPERMEABLE AREA PLAN Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN A DETAIL Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN B DETAILS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN C DETAILS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN F DETAILS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN F DETAILS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN F DETAILS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED ATTENUATION BASIN G DETAILS Drawing · 21 Jan 2026 View ↗ PDF PHASE 2C S104 SURFACE WATER LONGSECTIONS SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2C S104 SURFACE WATER LONGSECTIONS SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2D S104 SURFACE WATER LONGSECTIONS SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF S104 PHASING OVERVIEW Drawing · 21 Jan 2026 View ↗ PDF PROPOSED DITCH20 PLAN AND SECTIONS Drawing · 21 Jan 2026 View ↗ PDF PROPOSED DITCH21 PLAN AND SECTIONS Drawing · 21 Jan 2026 View ↗ PDF SITE LAYOUT PLAN Drawing · 21 Jan 2026 View ↗ PDF CONSTRUCTION MANAGEMENT PLAN Report · 21 Jan 2026 View ↗ PDF PHASE 2D S104 SURFACE WATER LONGSECTIONS SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2A S104 SURFACE WATER LONGSECTIONS SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2A S104 SURFACE WATER LONGSECTIONS SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2B S104 SURFACE WATER LONGSECTIONS SHEET 1 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2B S104 SURFACE WATER LONGSECTIONS SHEET 2 Drawing · 21 Jan 2026 View ↗ PDF PHASE 2B S104 SURFACE WATER LONGSECTIONS SHEET 3 Drawing · 21 Jan 2026 View ↗

All documents on the council site ↗

Associated applications 2

  • Part of

    Reserved mattersApprovedcouncil archive
    • Reserved mattersReserved matters application for appearance, landscaping, layout & scale in respect of phase 2…This application1/0050/2026/REMM

Site constraints 1

Agricultural land, grade 2, surveyed
Best and most versatile land (grades 1, 2 and 3a). From a field survey (Bristol). The older provisional map had this area as grade 3; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Full Application Major
Postcode
EX39 1AR
Received
21 Jan 2026
Validated
29 Jan 2026
Ward
Westward Ho!
Parish
Northam
Case officer
Show
Target decision
30 Apr 2026
Applicant
Show
Agent
Pegasus Planning Group Ltd

Public comments

6comments received
6 objecting

100% object · above the UK average of 75%

261 neighbours consulted · Last counted 8 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14599946
Neighbours
3 Feb 2026
Consultation
17 Jul 2026
Comments by
7 Aug 2026
Site or press notice
4 Feb 2026
Statutory expiry
30 Apr 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Major dwellings

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026