Net Zero Teesside Project Land In The Vicinity Of SSI Steelworks Redcar Data via plota.co.uk

26/0021/DCH - Discharge Conditions Awaiting decision

Proposal

Information to discharge condition no3 (Detailed design), no4 (landscape and biodiversity protection management and enhancement), no6 (external lighting (construction), no8 (means of enclosure), no10 (fire prevention), no11 (surface water drainage design (construction and operation)), no12 (flood risk mitigation) no13 (land contamination and groundwater) no15 (protected species) no16 (construction environmental management plan), no17 (protection of highway surfaces), no18 (construction traffic management plan) no19 (construction workers travel plan) no21 (control of noise (construction)) and no24 (site waste management) of application (EN010103) Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
5 Jan 2026
Consultation
25 Feb 2026
Decision
Expected by 2 Mar 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 2 Mar 2026. The consultation period closed on 18 Mar 2026.

Documents 26

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Filey Brigg to Newport Bridge across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); Inside the Redcar built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stockton-on-Tees - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge Conditions
Received
5 Jan 2026
Validated
5 Jan 2026
Case officer
Show
Target decision
2 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
DWD Property and Planning

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14599738
Consultation
25 Feb 2026
Comments by
18 Mar 2026
Statutory expiry
2 Mar 2026
Env. assessment
No
Stockton-on-Tees
Planning Authority Score
5.8/10
Average
#112 of 296 councils
Relevant to this application:
Householder decisions

Stockton-on-Tees ranks #180 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Stockton-on-Tees decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #67 of 296
97%
Householder approved
Above avg (90%) #44 of 296
61%
Decided in 8 weeks
Below avg (63%) #180 of 296
40%
Extended time limit
Below avg (41%) #155 of 296
79%
Minor dwellings approved
19 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
86%
Change of use approved
44 decided
612
Total decisions
41 refused in the year to March 2026