2025/1736/PAPP - Prior Approval Approved

Proposal

Prior Notification under schedule 2, part 6, class A to replace existing broken concrete yard area with new reinforced concrete for improving water quality purposes in the farm yard. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2025
✓
Approved
25 Sept 2025

Approved on 25 Sept 2025 · Delegated · Last checked 13 Oct 2026

Site constraints 4

Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 165 m away: Kirkby Moor SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval
Postcode
LA12 7PP
Received
8 Sept 2025
Validated
8 Sept 2025
Ward
Coniston and Hawkshead
Parish
Lowick
Case officer
Show
Decision
Prior Approval Not Required
Decision date
25 Sept 2025
Decision level
Delegated
Applicant
Show
Agent
Armitstead Barnett

How this decision compares

Decided in 17 days from validation, 5 days slower than Westmorland and Furness's median of 12 for prior approvals. Approved, as 96% of prior approvals here are.

93%decided within 8 weeks
96%approved
448decided in the last year

Plota live figures for prior approvals decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Statutory expiry
5 Oct 2025
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026