ST NICHOLAS PRIORY C OF E PRIMARY SCHOOL St Nicholas Road, Great Yarmouth, Norfolk Data via plota.co.uk

06/25/0437/F - Full Approved

Proposal

Conversion of two existing windows to external doors and installation of a new external stair access Data via plota.co.uk

View original council record ↗Last checked

Great Yarmouth Borough Council is publishing its applications late: so far it has put about half of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
5 Jun 2025
✓
Validated
22 Aug 2025
✓
Approved
29 Oct 2025

Approved on 29 Oct 2025 · Officer Delegated Decision · Last checked 16 Nov 2026

Site constraints 9

No.2 Market Place, Rows & North Quay conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
2 Article 4 directions
Article 4 Direction - Houses in Multiple Occupation Great Yarmouth · Article 4 Direction Great Yarmouth. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Heritage at risk: Market Place, Rows and North Quay
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Scheduled monument 35 m away: Town walls
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
National infrastructure project 204 m away: Great Yarmouth Third River Crossing
The site is 204 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Redmere Wind Farm (at pre-application, 865 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
17 listed buildings within 150 m
Nearest: 68, Market Place, Grade II, 29 m away · 1 Grade I, 15 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 17 with distances
Historic England ↗
Also on the record
Special protection area 397 m away: Outer Thames Estuary; National park 420 m away: The Broads; Inside the Great Yarmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Great Yarmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR30 1NL
Received
5 Jun 2025
Validated
22 Aug 2025
Ward
Central & Northgate
Parish
GY Central/Northgate
Case officer
Show
Target decision
31 Oct 2025
Decision
Approve
Decision date
29 Oct 2025
Decision level
Officer Delegated Decision
Applicant
Show

How this decision compares

Decided in 68 days from validation, 16 days faster than Great Yarmouth's median of 84 for full applications. Approved, as 69% of full applications here are.

27%decided within 8 weeks
69%approved
10%go to committee

Plota live figures for full applications decided by Great Yarmouth in the last twelve months, from validation. Great Yarmouth decision record →

Consultation & key dates

Consultation
2 Sept 2025
Comments by
3 Oct 2025
Statutory expiry
31 Oct 2025
Great Yarmouth
Planning Authority Score
4.4/10
Below average
#181 of 296 overall
Relevant to this application:
Householder decisions

Great Yarmouth is #125 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Great Yarmouth decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #171 of 296
92%
Householder approved
Above avg (90%) #154 of 296
69%
Decided in 8 weeks
Above avg (63%) #125 of 296
49%
Extended time limit
Above avg (41%) #221 of 296
69%
Minor dwellings approved
51 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
89%
Change of use approved
18 decided
366
Total decisions
47 refused in the year to March 2026