Land At St Edwards Road (R/O Marina Buildings) Gosport Hampshire PO12 1NZ Data via plota.co.uk

25/00197/VOC - Removal or Variation of Condition Refused

Proposal

Removal of conditions 3 (parking provision), condition 4 (allocated parking) and condition 5 (visitor parking) of planning permission K.15643/1 () for conversion of 4no. Ground floor shops and first and second floor maisonettes to 12no. Flats and car parking provision Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Jun 2025
✓
Validated
7 Jul 2025
✓
Consultation
8 Jul 2025
✗
Refused
4 Sept 2025
Appeal
Not lodged

Refused on 4 Sept 2025 · Delegated Decision · Last checked 15 Oct 2026

Documents 10

Consultation & comments 4

PDF Commenter’s name hidden Show Public Comment · 28 Jul 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 21 Jul 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 16 Jul 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 14 Jul 2025 View ↗

All documents on the council site ↗

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 206 m away: Portsmouth Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 206 m away: Portsmouth Harbour SSSI; Inside the Gosport built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
Removal or Variation of Condition
Postcode
PO12 1NZ
Received
12 Jun 2025
Validated
7 Jul 2025
Ward
Harbourside And Town
Case officer
Show
Target decision
1 Sept 2025
Decision
Refuse
Decision date
4 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Zest Eco Ltd

Public comments

1comment received
1 objecting

30 neighbours consulted · Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14080493
Planning Portal ref
PP-14080493
Neighbours
15 Aug 2025
Consultation
8 Jul 2025
Comments by
31 Jul 2025
Site or press notice
10 Jul 2025
Statutory expiry
1 Sept 2025
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 overall
Relevant to this application:
Householder decisions

Gosport is faster than most councils at deciding householder applications: #66 of 296 on speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026