Air Training Corps, Nelson Way, Boston, PE21 8TS Data via plota.co.uk

B/26/0266 - Full Planning Permission Approved

Proposal

Proposed change of use of building to create emergency accommodation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2026
✓
Consultation
13 Jul 2026
✓
Approved
6 Oct 2026

Approved on 6 Oct 2026 · Currently called into committee · Last checked 9 Oct 2026

Documents 21

All documents on the council site ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
National infrastructure project about 1.5 km away: Boston Alternative Energy Facility (BAEF); 1 listed building within 150 m of the postcode pin; Inside the Boston built-up area; Air quality management area about 45 m away: Haven Bridge AQMA.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE21 8TS
Received
2 Jul 2026
Validated
2 Jul 2026
Ward
Skirbeck Ward
Parish
Boston
Case officer
Show
Target decision
9 Oct 2026
Decision
Approved
Decision date
6 Oct 2026
Decision level
Currently called into committee
Applicant
Show
Agent
Lincs Design Consultancy

How this decision compares

Decided in 96 days from validation, 26 days slower than Boston's median of 70 for changes of use. Approved, as 66% of changes of use here are.

28%decided within 8 weeks
66%approved
13%go to committee

Plota live figures for changes of use decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

96 neighbours consulted · Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
13 Jul 2026
Consultation
13 Jul 2026
Comments by
3 Aug 2026
Committee
6 Oct 2026
Statutory expiry
27 Aug 2026
Env. assessment
No