Outside 119 Longdown Lane South Epsom Surrey Data via plota.co.uk

26/00987/NOTTE - Telecom Development - Notification Approved

Proposal

Install fixed line broadband electronic communications apparatus under Regulation 5, detailed as 9m light pole at the above location. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
✓
Approved
15 Sept 2026

Approved on 15 Sept 2026 · Delegated Decision · Last checked 24 Sept 2026

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
3 listed buildings within 150 m
Nearest: Epsom College: The Original Eastern Range comprising Whitehouse Girls' House, Crawfurd Girls' House, The Dining Hall, Granville Boy's House, the IT and Drama Studios, the Big School Assembly Hall and, Grade II, 35 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Radon affected area, class 2; Inside the Epsom built-up area; Tree preservation order 23 m away: TPO 45 - College Road - Links Road; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Epsom and Ewell - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecom Development - Notification
Postcode
KT17 4JL
Received
20 Aug 2026
Validated
20 Aug 2026
Ward
College
Case officer
Show
Decision
No Objections
Decision date
15 Sept 2026
Decision level
Delegated Decision
Agent
Openreach

How this decision compares

Decided in 26 days from validation, 10 days faster than Epsom and Ewell's median of 36 for prior approvals. Approved, as 87% of prior approvals here are.

90%decided within 8 weeks
87%approved
72decided in the last year

Plota live figures for prior approvals decided by Epsom and Ewell in the last twelve months, from validation. Epsom and Ewell decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Epsom and Ewell
Planning Authority Score
7.4/10
Good
#47 of 296 overall
Relevant to this application:
Householder decisions

Epsom and Ewell is one of the fastest councils in England for householder decisions: #16 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Epsom and Ewell decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #236 of 296
89%
Householder approved
Below avg (90%) #203 of 296
90%
Decided in 8 weeks
Above avg (63%) #16 of 296
14%
Extended time limit
Below avg (41%) #10 of 296
66%
Minor dwellings approved
68 decided (1-9 homes)
80%
Major dwellings approved
10 decided (10+ homes)
64%
Change of use approved
11 decided
639
Total decisions
110 refused in the year to March 2026