Clayponds Open Space Clayponds Gardens London W5 4RQ Data via plota.co.uk

263459CONS - Consultation by Other Boroughs No Objection

Proposal

Replacement of ball court (MUGA) to a football foundation play zone, installation of new fencing, lighting and surface joint (Out of Borough) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
11 Sept 2026
Decision
Target date was 2 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Ealing's recent commercial and major works.

Site constraints 6

Article 4 direction
Dwellinghouses (C3) to small HMOs (C4) - borough-wide Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Hounslow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
2 listed buildings within 150 m of the postcode pin; Inside the Hounslow built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space about 26 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Consultation by Other Boroughs
Postcode
W5 4RQ
Received
11 Sept 2026
Validated
11 Sept 2026
Ward
Out Of Borough
Case officer
Show
Target decision
2 Oct 2026

Decision outlook

Day 73, past the statutory target. 72% of commercial and major works in Ealing are decided within thirteen weeks, which runs to 11 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 7317 days past the 56-day target
43%decided within 8 weeks
90%approved
64decided in the last year

Plota live figures for commercial and major works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
2 Oct 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026