Earls Court Underground Station, Earl's Court Road, London, SW5 9SY Data via plota.co.uk

LB/26/05793 - Listed Building Consent Consultation

Proposal

Works to improve facilities within signalling buildings and facilitate safe roof maintenance, including: installation of air conditioning units, safety railings and a cat ladder; removal of rooflight, and creation of a new access doorway. (Partially retrospective application) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
✓
Validated
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Jan 2027 and 7 Mar 2027, from Kensington and Chelsea's recent utility and infrastructure works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Site constraints 8

Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
1 listed building within 150 m of the postcode pin
Nearest: Earls Court Station, Grade II, about 9 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Conservation area about 22 m away: Earl's Court Square
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National infrastructure project about 1.4 km away: Thames Tideway Tunnel; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Tree preservation order about 22 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
SW5 9SY
Received
23 Oct 2026
Validated
16 Nov 2026
Ward
Earl's Court
Case officer
Show
Target decision
11 Jan 2027

Decision outlook

Day 4 of the 56-day target. Kensington and Chelsea usually decides utility and infrastructure works by day 83.

Day 479 days to the predicted decision (day 83)
32%decided within 8 weeks
90%approved
360decided in the last year

Plota live figures for utility and infrastructure works decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Consultation & key dates

Comments by
11 Dec 2026
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 overall
Relevant to this application:
Other decisions

Kensington and Chelsea is #174 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025