2 - 3, Holmes Production Ltd, Hanover Yard, London, N1 8BE Data via plota.co.uk

P2025/0991/FUL - Full Planning Application Refused

Proposal

Creation of roof terrace to existing flat roof, associated timber screening and installation of green roof. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Apr 2025
✓
Consultation
17 Apr 2025
✗
Refused
1 Jul 2025
✗
Appeal dismissed
23 Jan 2026

Refused on 1 Jul 2025 · Planning Sub-Committee A · Last checked 21 Nov 2026

Documents 23

All documents on the council site ↗

Site constraints 11

Article 4 directionCrossrail 2B1c locations across the borough (outside CAZ andDuncan Terrace/Colebrooke RowII
Grade II listed: Numbers 64 to 82 (Even) and Attached Railings
List entry 1208922 · 23 m away · 6 more listed buildings within 150 m (6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 6 with distances
Historic England ↗
Duncan Terrace/Colebrooke Row conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Crossrail 2Council record
Recorded by the council for this site.
Council site ↗
B1c locations across the borough (outside CAZ andCouncil record
Recorded by the council for this site.
Council site ↗
Duncan Terrace/Colebrooke RowCouncil record
Recorded by the council for this site.
Council site ↗
IICouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Islington built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; National infrastructure project 1.8 km away: London Strategic Heat Main Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area464 m² (4,994 sq ft)
Energy ratingE (asset rating 107)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Full Planning Application
Postcode
N1 8BE
Received
4 Apr 2025
Validated
4 Apr 2025
Ward
St Peter's & Canalside
Case officer
Show
Target decision
29 May 2025
Decision
Refusal of permission
Decision date
1 Jul 2025
Decision level
Planning Sub-Committee A
Appeal
Dismissed · 23 Jan 2026 · Written Representations · Inspectorate case 3369241 ↗
Applicant
Show
Agent
Rory Kyle

How this decision compares

Decided in 88 days from validation, 35 days slower than Islington's median of 53 for full applications. Refused, as 12% of full applications here are.

59%decided within 8 weeks
88%approved
704decided in the last year

Plota live figures for full applications decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-13918882
Comments by
10 May 2025
Site or press notice
17 Apr 2025
Committee
19 Jun 2025
Statutory expiry
18 Aug 2025
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 overall
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications: #260 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.