Land East Of 16 Excelsior Terrace, Pit Road, Midsomer Norton, Bath And North East Somerset, Data via plota.co.uk

25/03510/OUT - Outline Application Pending Consideration

Proposal

Outline application with some matters reserved for the erection of 1no. two storey detached dwelling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Sept 2025
Decision
Target date was 31 Oct 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 444.

Site constraints 6

Midsomer Norton and Welton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Midsomer Norton and Welton
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; 1 listed building within 150 m of the postcode pin; Inside the Midsomer Norton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Outline Application
Received
5 Sept 2025
Validated
5 Sept 2025
Ward
Midsomer Norton Redfield
Parish
Midsomer Norton
Case officer
Show
Target decision
31 Oct 2025
Applicant
Show
Agent
MB Architectural Services

Decision outlook

Day 444, past the statutory target. 37% of outline applications in Bath are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 444388 days past the 56-day target
21%decided within 8 weeks
68%approved
21decided in the last year

Plota live figures for outline applications decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-14300424
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 overall
Relevant to this application:
Major dwellings

Bath is slower than most councils at deciding householder applications: #236 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026