Havant Footbridge, Havant, PO9 2AB Data via plota.co.uk

APP/25/01004 - County Consultation Decision Made

Proposal

Hampshire County Council Consultation for Demolition of the existing footbridge and construction of a replacement footbridge. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 27 Nov 2025
Decision
Target date was 18 Dec 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 361.

Documents 75

Other documents 39

PDF Additional Information for Network Rail 5 February 2026 Application · 5 Feb 2026 View ↗ PDF Amended List of documents for the planning 18.12.2025 Application · 23 Dec 2025 View ↗ PDF Additional Information 18 December 2025 Application · 23 Dec 2025 View ↗ PDF Stat_BNG_Calc_Tool_Rev 20251030 EXCEL_X · 27 Nov 2025 View ↗ PDF CAVAT HBC StationFootbridge PDF · 27 Nov 2025 View ↗ PDF proposed runoff southern network PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1701 Existing General Arrangement PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1705 B GA Proposed Foundations 2 of 2 PDF · 27 Nov 2025 View ↗ PDF Superseded List of documents for the planning PDF · 27 Nov 2025 View ↗ PDF P-HBD-HvntStnFtbrdg-SS24762-TPP-1.5 PDF · 27 Nov 2025 View ↗ PDF Water Quality Toolkit - Non-residential parking sheet 2 PDF · 27 Nov 2025 View ↗ PDF proposed runoff northern network PDF · 27 Nov 2025 View ↗ PDF P-HBC-HvntStnFtbrdge-SS24762-DATA with impact-1.5 PDF · 27 Nov 2025 View ↗ PDF P-HBD-HvntStnFtbrdg-SS24762-TRP-1.5Proposed GA PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1707 Temporary and Permanent Fencing at Site Boundary PDF · 27 Nov 2025 View ↗ PDF P-HBD-HvntStnFtbrdg-SS24762-TCP-1.5 PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1711 Statutory Undertakers Location PDF · 27 Nov 2025 View ↗ PDF TF-24-356-R01 Ground Investigation (Final) PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1713 PEDESTRIANS and CYCLISTS WEST DIVERSION ROUTE PDF · 27 Nov 2025 View ↗ PDF Sewer Record Map PDF · 27 Nov 2025 View ↗ PDF C.J009595-HEH-HDG-17025323-DR-CD-0010 S4 P02 Proposed Impermeable Areas PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1714 INDICATIVE HGV DELIVERY ROUTE 1 PDF · 27 Nov 2025 View ↗ PDF P-HBC-HvntStnFtbrdg-SS24762-AMS-1.5 PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1712 PEDESTRIANS and CYCLISTS EAST DIVERSION ROUTE PDF · 27 Nov 2025 View ↗ PDF P-HBC-HvntStnFtbrdge-SS24762-WORKS-1.5 PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1709 Landscape Proposed Details PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1705 A GA Proposed Foundations 1of 2 PDF · 27 Nov 2025 View ↗ PDF Existing runoff southern network PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1702 Proposed GA PDF · 27 Nov 2025 View ↗ PDF CJ009595-HEL-HLG-FB560-DR-EO-0001 PDF · 27 Nov 2025 View ↗ PDF Notice PDF · 27 Nov 2025 View ↗ PDF Water Quality Toolkit - Non-residential parking Sheet 1 PDF · 27 Nov 2025 View ↗ PDF ApplicationFormRedacted PDF · 27 Nov 2025 View ↗ PDF C.J009595-HES-SGN-FB560-DR-S-1715 INDICATIVE HGV DELIVERY ROUTE 2 PDF · 27 Nov 2025 View ↗ PDF P-HBD-HvntStnFtbrdg-SS24762-TRP-1.5 PDF · 27 Nov 2025 View ↗ PDF C.J009595-HEH-HDG-17025323-DR-CD-0009 S4 P02 Existing Impermeable Areas PDF · 27 Nov 2025 View ↗ PDF Havant FB Proposed FB images PDF · 27 Nov 2025 View ↗ PDF Existing runoff northern network PDF · 27 Nov 2025 View ↗ PDF Havant Footbridge CEMP Nov 2025 PDF · 27 Nov 2025 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 680 m away: Hampshire Water Transfer and Water Recycling Project
The site is about 680 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; Inside the Havant built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
County Consultation
Postcode
PO9 2AB
Received
around 27 Nov 2025
Validated
27 Nov 2025
Ward
St Faiths
Case officer
Show
Target decision
18 Dec 2025
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 361, past the statutory target. 73% of demolitions in Havant are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 361305 days past the 56-day target
47%decided within 8 weeks
93%approved
31decided in the last year

Plota live figures for demolitions decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

4comments received
2 objecting1 neutral1 supporting

50% object · below the UK average of 74%

Last counted 19 Nov 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026