26/1128/F - Full Planning Permission Approved

Proposal

Change of use of light industrial warehouse unit (Use Class E(g)(iii) to storage and distribution (Use Class B8) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Apr 2026
✓
Validated
15 Apr 2026
✓
Consultation
20 Apr 2026
✓
Approved
12 Jun 2026

Approved on 12 Jun 2026 · Delegation · Last checked 2 Aug 2026

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1629 m); London Strategic Heat Main Project (at pre-application, 437 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area591 m² (6,361 sq ft)
Energy ratingD (asset rating 80)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in February 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Full Planning Permission
Postcode
SE7 7SQ
Received
10 Apr 2026
Validated
15 Apr 2026
Ward
CHARLTON VILLAGE & RIVERSIDE
Parish
Woolwich & Thamesmead
Case officer
Show
Target decision
10 Jun 2026
Decision
Approve
Decision date
12 Jun 2026
Decision level
Delegation
Applicant
Show
Agent
Dovetail Architects Ltd

How this decision compares

Decided in 58 days from validation, about the council's usual 56 days. Approved, as 43% of changes of use here are.

73%decided within 8 weeks
43%approved
114decided in the last year

Plota live figures for changes of use decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

1comment received
1 objecting

52 neighbours consulted · Last counted 2 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14822074
Planning Portal ref
PP-14822074
Consultation
20 Apr 2026
Comments by
8 May 2026
Statutory expiry
10 Jun 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Change of use

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026