Elliot's Way Braceborough Lincolnshire PE9 4NL Data via plota.co.uk

S26/0335 - Communications Notifications Approved

Proposal

Regulation 5 notice of intention to install fixed line broadband apparatus. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Feb 2026
✓
Approved
25 Feb 2026

Approved on 25 Feb 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 621 m away: Mallard Pass Solar Project
The site is about 621 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
3 listed buildings within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Communications Notifications
Postcode
PE9 4NL
Received
19 Feb 2026
Validated
19 Feb 2026
Ward
Dole Wood Ward
Parish
Braceborough & Wilsthorpe Parish Council
Case officer
Show
Target decision
19 Mar 2026
Decision
No Objections Made
Decision date
25 Feb 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 6 days from validation, 18 days faster than South Kesteven's median of 24 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

85%decided within 8 weeks
98%approved
88decided in the last year

Plota live figures for utility and infrastructure works decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Consultation & key dates

Statutory expiry
19 Mar 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 overall
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications: #262 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026