Telecommunication Site Verge at Junction of Steepdown Road Halewick Lane Sompting West Sussex Data via plota.co.uk

SDNP/26/01187/PNTEL - Prior Notification Telecoms (28 day) Approved

Proposal

Notification Under the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (As Amended) To Utilise Permitted Development Rights at Existing Telecommunications Base Station - The upgrade of the existing telecommunications base station to provide improved network coverage, including 5G. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Mar 2026
✓
Approved
20 Apr 2026

Approved on 20 Apr 2026 · SDNPA Delegated Decision · Last checked 6 Jul 2026

Site constraints 3

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National park about 6 m away: South Downs
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
National infrastructure project about 1.4 km away: Rampion Offshore Wind Farm.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Notification Telecoms (28 day)
Postcode
BN15 0LH
Received
24 Mar 2026
Validated
24 Mar 2026
Ward
Cokeham Ward
Parish
Sompting Parish Council
Case officer
Show
Target decision
21 Apr 2026
Decision
Raise No Objection
Decision date
20 Apr 2026
Decision level
SDNPA Delegated Decision
Applicant
Show

How this decision compares

Decided in 27 days from validation, about the council's usual 26 days. Approved, as 89% of prior approvals here are.

77%decided within 8 weeks
89%approved
219decided in the last year

Plota live figures for prior approvals decided by South Downs in the last twelve months, from validation. South Downs decision record →

Consultation & key dates

Statutory expiry
21 Apr 2026
Env. assessment
No