Aquatic Control Engineering Ltd Hall Farm Main Street Rampton Nottinghamshire DN22 0HR Data via plota.co.uk

26/00799/FUL - Full Planning Permission Approved

Proposal

Extension of Combined Warehouse/Workshop to Provide Research and Development Building Including Installation of Roof Mounted Photovoltaic Panels, Extension of Staff Car Parking Area and Formation of Hardstanding. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
✓
Consultation
29 Jul 2026
✓
Validated
30 Jul 2026
✓
Approved
13 Oct 2026

Approved on 13 Oct 2026 · Delegated After Referring To PCG · Last checked 14 Oct 2026

Documents 17

All documents on the council site ↗

Site constraints 4

Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 711 m away: Gate Burton Energy Park
The site is 711 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Cottam Solar Project (decided, 791 m); Tillbridge Solar Project (decided, 792 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Rampton (Bassetlaw) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bassetlaw - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bassetlaw
Application type
Full Planning Permission
Postcode
DN22 0HR
Received
30 Jun 2026
Validated
30 Jul 2026
Ward
Rampton
Parish
Rampton And Woodbeck
Case officer
Show
Target decision
14 Oct 2026
Decision
Grant
Decision date
13 Oct 2026
Decision level
Delegated After Referring To PCG
Applicant
Show
Agent
JHG PLANNING CONSULTANCY LTD

How this decision compares

Decided in 75 days from validation, about the council's usual 77 days. Approved, as 77% of commercial and major works here are.

31%decided within 8 weeks
77%approved
34decided in the last year

Plota live figures for commercial and major works decided by Bassetlaw in the last twelve months, from validation. Bassetlaw decision record →

Public comments

1comment received
1 objecting

8 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15047392
Planning Portal ref
PP-15047392
Neighbours
7 Jul 2026
Consultation
29 Jul 2026
Comments by
19 Aug 2026
Site or press notice
9 Jul 2026
Statutory expiry
24 Sept 2026
Env. assessment
No
Bassetlaw
Planning Authority Score
1.2/10
Poor
#286 of 296 overall
Relevant to this application:
Householder decisions

Bassetlaw is one of the slowest councils in England for householder decisions: #291 of 296 on speed. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bassetlaw decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #203 of 296
89%
Householder approved
Below avg (90%) #199 of 296
25%
Decided in 8 weeks
Below avg (63%) #291 of 296
73%
Extended time limit
Above avg (41%) #289 of 296
68%
Minor dwellings approved
77 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
78%
Change of use approved
45 decided
575
Total decisions
87 refused in the year to March 2026