Mallard Pass Solar Farm Data via plota.co.uk

S26/0956 - NSIP Requirement Approved

Proposal

Submission of details pursuant to Requirement 6 - Detailed design approval for Phase 2 Main Construction Works in relation to The Mallard Pass Solar Farm Order 2024 No. 796. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 May 2026
✓
Validated
3 Jun 2026
✓
Approved
6 Nov 2026

Approved on 6 Nov 2026 · Delegated Decision · Last checked 6 Nov 2026

Documents 71

Plans & drawings 42

PDF PLANTING PLAN Drawing · 15 Oct 2026 View ↗ PDF OVERALL PLANTING PLAN Drawing · 20 Aug 2026 View ↗ PDF PLANTING PLAN 1 Drawing · 20 Aug 2026 View ↗ PDF PLANTING PLAN 2 Drawing · 20 Aug 2026 View ↗ PDF PLANTING PLAN 3 Drawing · 20 Aug 2026 View ↗ PDF PLANTING PLAN 4 Drawing · 20 Aug 2026 View ↗ PDF PLANTING PLAN 5 Drawing · 20 Aug 2026 View ↗ PDF CCTV DETAILED DRAWING Drawing · 14 Aug 2026 View ↗ PDF LOCAL AUTHORITIES BOUNDARIES Drawing · 14 Aug 2026 View ↗ PDF MV STATION DETAILED DRAWING STORAGE CONTAINER Drawing · 14 Aug 2026 View ↗ PDF PV PANELS AND ELEVATIONS Drawing · 14 Aug 2026 View ↗ PDF RESIDENTIAL SENSITIVE RECEPTORS Drawing · 14 Aug 2026 View ↗ PDF SOLAR SITE MASTER DWG Drawing · 14 Aug 2026 View ↗ PDF SOLAR SITE TRACKS LAYOUT Drawing · 14 Aug 2026 View ↗ PDF 400 KV CABLE TRENCH SECTION Drawing · 14 Aug 2026 View ↗ PDF 400 KV SUBSTATION LAYOUT Drawing · 14 Aug 2026 View ↗ PDF SUBSTATION PERMANENT SOIL BUND Drawing · 14 Aug 2026 View ↗ PDF SWITCHYARD ELEVATION Drawing · 14 Aug 2026 View ↗ PDF SOLAR SITE CABLE DETAILS Drawing · 14 Aug 2026 View ↗ PDF CONSTRUCTION ACCESS ROUTES Drawing · 14 Aug 2026 View ↗ PDF PRIMARY CONSTRUCTION COMPOUND LAYOUTS Drawing · 14 Aug 2026 View ↗ PDF PROW DIVERSIONS Drawing · 14 Aug 2026 View ↗ PDF CCTV DETAIL DRAWING Drawing · 3 Jun 2026 View ↗ PDF LOCAL AUTHORITY BOUNDARIES Drawing · 3 Jun 2026 View ↗ PDF WORK 1 MV STATION DETAILED DRAWING Drawing · 3 Jun 2026 View ↗ PDF WORK 1 PV PANELS AND ELEVATIONS Drawing · 3 Jun 2026 View ↗ PDF WORK 1 RESIDENTIAL SENSITIVE RECEPTORS Drawing · 3 Jun 2026 View ↗ PDF WORK 1 SOLAR SITE MASTER DWG Drawing · 3 Jun 2026 View ↗ PDF WORK 1 SOLAR SITE TRACKS LAYOUT Drawing · 3 Jun 2026 View ↗ PDF WORKS 2 AND 3 400 KV CABLE TRENCH SECTION Drawing · 3 Jun 2026 View ↗ PDF WORKS 2 AND 3 400 KV SUBSTATION LAYOUT Drawing · 3 Jun 2026 View ↗ PDF WORKS 2 AND 3 SWITCHYARD ELEVATION Drawing · 3 Jun 2026 View ↗ PDF WORK 4 SOLAR SITE CABLE DITCH DETAILS Drawing · 3 Jun 2026 View ↗ PDF WORK 5 CONSTRUCTION ACCESS ROUTES Drawing · 3 Jun 2026 View ↗ PDF WORK 5 PRIMARY CONSTRUCTION COMPOUND LAYOUTS Drawing · 3 Jun 2026 View ↗ PDF WORK 5 PROW DIVERSIONS Drawing · 3 Jun 2026 View ↗ PDF WORK 7 OVERALL PLANTING PLAN Drawing · 3 Jun 2026 View ↗ PDF WORK 7 PLANTING PLAN 1 OF 5 Drawing · 3 Jun 2026 View ↗ PDF WORK 7 PLANTING PLAN 2 OF 5 Drawing · 3 Jun 2026 View ↗ PDF WORK 7 PLANTING PLAN 3 OF 5 Drawing · 3 Jun 2026 View ↗ PDF WORK 7 PLANTING PLAN 4 OF 5 Drawing · 3 Jun 2026 View ↗ PDF WORK 7 PLANTING PLAN 5 OF 5 Drawing · 3 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 444 m away: Mallard Pass Solar Project
The site is 444 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
NSIP Requirement
Postcode
PE9 4SR
Received
15 May 2026
Validated
3 Jun 2026
Ward
Casewick Ward
Parish
Uffington Parish Council
Case officer
Show
Target decision
12 Aug 2026
Decision
Condition(s) discharged ALL
Decision date
6 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Envams

Public comments

2comments received
1 objecting1 neutral

2 neighbours consulted · Last counted 6 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
4 Sept 2026
Committee
9 Jul 2026
Statutory expiry
12 Aug 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 overall
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications: #262 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026