Telecommunications Mast O2 10094 Hawton Lane Farndon Data via plota.co.uk

26/01744/TELNOT - Notifications The Electronic Comms Code Approved

Proposal

Remove existing 15.0m monopole supporting 6 Antennas and 3 Rrus. replaced with 22.50m monopole supporting 6 Antennas, 15 Rrus and 2 0.3m transmission dishes on new concrete base. Existing equipment cabinets within compound to be re-used for proposed upgrade works and ancillary development thereto. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Approved
16 Nov 2026

Approved on 16 Nov 2026 · Delegated Officer · Last checked 17 Nov 2026

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 622 m away: A46 Newark Bypass
The site is 622 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Farndon (Newark and Sherwood) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newark and Sherwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Notifications The Electronic Comms Code
Received
26 Oct 2026
Validated
26 Oct 2026
Ward
Farndon And Fernwood
Parish
Farndon
Case officer
Show
Target decision
23 Nov 2026
Decision
No Objection
Decision date
16 Nov 2026
Decision level
Delegated Officer
Applicant
Show
Agent
Eoin Ritchie

How this decision compares

Decided in 21 days from validation, 6 days faster than Newark and Sherwood's median of 27 for prior approvals. Approved, as 94% of prior approvals here are.

96%decided within 8 weeks
94%approved
123decided in the last year

Plota live figures for prior approvals decided by Newark and Sherwood in the last twelve months, from validation. Newark and Sherwood decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
23 Nov 2026
Env. assessment
No
Newark and Sherwood
Planning Authority Score
3.9/10
Below average
#198 of 296 overall
Relevant to this application:
Householder decisions

Newark and Sherwood is slower than most councils at deciding householder applications: #241 of 296 on speed. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newark and Sherwood decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #88 of 296
96%
Householder approved
Above avg (90%) #55 of 296
50%
Decided in 8 weeks
Below avg (63%) #241 of 296
54%
Extended time limit
Above avg (41%) #244 of 296
80%
Minor dwellings approved
110 decided (1-9 homes)
88%
Major dwellings approved
25 decided (10+ homes)
82%
Change of use approved
33 decided
767
Total decisions
63 refused in the year to March 2026