Ground Floor 1 Silver Fox Way West Allotment Newcastle Upon Tyne NE27 0QJ Data via plota.co.uk

26/00234/ADV - express consent to display an advert Approved

Proposal

Installation of signage comprising: 1. A building mounted illuminated fascia sign on the east elevation, incorporating built up, internally illuminated lettering fitted flush to the building frontage. 2. A freestanding illuminated totem sign positioned within the roadside forecourt/landscaped frontage, constructed as a vertical panel structure with internally illuminated graphic elements Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Feb 2026
✓
Validated
23 Feb 2026
✓
Consultation
24 Feb 2026
✓
Approved
16 Apr 2026

Approved on 16 Apr 2026 · Delegated Decision · Last checked 6 Jul 2026

Site constraints 5

Local nature reserve about 180 m away: Silverlink Biodiversity Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 447 m away: A19/A1058 Coast Road Junction Improvement
The site is about 447 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Tynemouth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
express consent to display an advert
Postcode
NE27 0QJ
Received
17 Feb 2026
Validated
23 Feb 2026
Ward
Shiremoor
Parish
North Shields
Case officer
Show
Target decision
20 Apr 2026
Decision
Application Permitted
Decision date
16 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
RLB

How this decision compares

Decided in 52 days from validation, about the council's usual 53 days. Approved, as 100% of signs and adverts here are.

100%decided within 8 weeks
100%approved
32decided in the last year

Plota live figures for signs and adverts decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Consultation & key dates

Alt. reference
PP-14689275
Planning Portal ref
PP-14689275
Consultation
24 Feb 2026
Comments by
17 Mar 2026
Statutory expiry
20 Apr 2026
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 councils
Relevant to this application:
Other decisions

North Tyneside is faster than most councils at deciding householder applications, ranking #35 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026