Land South Of Lychgate Lane Aston Flamville Leicester LE10 3AQ Data via plota.co.uk

26/0231/FUL - Full Application Approved at committee

Approved at planning committee on 11 June 2026. The council has not issued its decision notice yet.

Proposal

Retrospective change of use of land as a residential caravan site, comprising 10 Gypsy and Traveller pitches accommodating a total of 10 static caravans/mobile homes, installation of hardstanding, construction of earth bunding and installation of package sewage treatment plant Data via plota.co.uk

View original council record ↗Last checked

Blaby District Council is publishing its applications late: so far it has put about half of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
17 Mar 2026
✓
Committee
11 Jun 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 251.

The consultation period closed on 2 May 2026.

Planning committee

Decided by Blaby Planning Committee on 11 Jun 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised approval because the site met relevant policies and addressed a recognised shortage of Gypsy and Traveller accommodation.
  • Consultees raised no objections, the travellers unit supported the proposal, and no residents’ objection letters were received.
  • A deferral motion was withdrawn, and the committee approved the application subject to conditions, including landscaping timing and a plans condition.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, committee debate and decision.

Source: Plota analysis of Blaby's committee minutes of 11 Jun 2026.

Site constraints 3

Aston Flamville conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 296 m away: Hinckley National Rail Freight Interchange
The site is about 296 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blaby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blaby
Application type
Full Application
Postcode
LE10 3AQ
Received
17 Mar 2026
Validated
17 Mar 2026
Case officer
Show
Target decision
16 Jun 2026
Decision level
Delegated
Applicant
Show
Agent
Philip Brown Associates Limited

Decision outlook

Day 251, past the statutory target. 52% of full applications in Blaby are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 251195 days past the 56-day target
20%decided within 8 weeks
84%approved
6%go to committee

Plota live figures for full applications decided by Blaby in the last twelve months, from validation. Blaby decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14786064
Planning Portal ref
PP-14786064
Comments by
2 May 2026
Committee
11 Jun 2026
Statutory expiry
16 Jun 2026
Env. assessment
No
Blaby
Planning Authority Score
4.1/10
Below average
#190 of 296 overall
Relevant to this application:
Change of use

Blaby is slower than most councils at deciding householder applications: #237 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Blaby decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #76 of 296
96%
Householder approved
Above avg (90%) #50 of 296
50%
Decided in 8 weeks
Below avg (63%) #237 of 296
53%
Extended time limit
Above avg (41%) #239 of 296
81%
Minor dwellings approved
32 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
80%
Change of use approved
35 decided
467
Total decisions
37 refused in the year to March 2026