30 Dewey Road, Dagenham, Barking And Dagenham, RM10 8AR Data via plota.co.uk

25/00526/CLUE - Lawful Development Certificate (Existing Use) Refused

Proposal

Application for a lawful development certificate (existing) for the use of the house as an HMO (C4) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Mar 2025
✓
Validated
11 Jun 2025
✗
Refused
5 Aug 2025
Appeal
Not lodged

Refused on 5 Aug 2025 · Last checked 22 Nov 2026

Documents 33

All documents on the council site ↗

Site constraints 7

Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve about 219 m away: Beam Valley
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Barking and Dagenham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 22 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Lawful Development Certificate (Existing Use)
Postcode
RM10 8AR
Received
31 Mar 2025
Validated
11 Jun 2025
Ward
Village
Case officer
Show
Target decision
6 Aug 2025
Decision
Not Lawful (Certificate)
Decision date
5 Aug 2025
Applicant
Show
Agent
BSA

Consultation & key dates

Statutory expiry
6 Aug 2025
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 overall
Relevant to this application:
Householder decisions

Barking and Dagenham is one of the fastest councils in England for householder decisions: #9 of 296 on speed. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026